ITAC Assessment: MA0217
ITAC logo
ITAC Assessment: MA0217
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product POWER CORDS
NAICS
n/a
SIC 3351: Rolling, Drawing, and Extruding Of Copper
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area
n/a
Annual Production 175
thousand feet
Production Hrs. Annual 4,500
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $333,778 4,033,118
kWh
Natural Gas $5,843 879
MMBtu
Fuel Oil #4 $166,504 34,795
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $111,190 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #4 Savings
01 2.1331: Burn a less expensive grade of fuel $51,002 $4,050 - $51,002
-
MMBtu
02 2.2414: Use waste heat from hot flue gases to preheat $13,862 $19,305 - $13,862
-
MMBtu
03 2.1233: Analyze flue gas for proper air/fuel ratio $11,453 $1,500 - $11,453
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $9,357 $30,000 $9,357
113,423
kWh
-
05 2.5123: Reduce fluid flow rates $8,252 $330 $8,252
99,941
kWh
-
06 2.7226: Use computer programs to optimize hvac performance $7,199 - - $7,199
-
MMBtu
07 2.2136: Install / repair insulation on steam lines $5,777 $3,874 - $5,777
-
MMBtu
08 2.6218: Turn off equipment when not in use $2,370 - $2,370
28,722
kWh
-
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $998 - $998
12,016
kWh
-
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $920 $1,839 $920
11,137
kWh
-
TOTAL RECOMMENDED $111,190 $60,898 $21,897
265,239
kWh
$89,293
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #4 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs