ITAC Assessment: TT0123
ITAC logo
ITAC Assessment: TT0123
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Plastic Automotive Parts
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 85,000
ft2
Annual Production 3,500,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $413,656 6,258,120
kWh
Electricity Demand $154,749 15,189
kW-mo/yr
Electricity Fees $(-54,492.0) -
Natural Gas $5,925 703
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $106,178 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,531

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $862 $50 $658
9,972
kWh
$204
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,327 $3,526 $689
10,440
kWh
$638
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $775 $835 $592
8,976
kWh
$183
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $14,294 $27,232 $10,920
165,600
kWh
$3,374
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,752 $10,856 $2,150
32,500
kWh
$602
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $5,151 $64,014 $3,936
59,640
kWh
$1,215
-
kW-mo/yr
-
07 2.7224: Reduce space conditioning during non-working hours $6,774 $500 $6,774
104,897
kWh
- -
08 2.8112: Combine utility meters $71,348 $9,384 - - $71,348
09 4.812: Apply for investment incentives $305 - - - $305
10 2.4231: Reduce the pressure of compressed air to the minimum required $2,590 $6,000 $1,979
29,992
kWh
$611
-
kW-mo/yr
-
TOTAL RECOMMENDED $106,178 $122,397 $27,698
422,017
kWh
$6,827
-
kW-mo/yr
$71,653
TOTAL IMPLEMENTED $10,531 $6,550 $9,411
144,861
kWh
$815
-
kW-mo/yr
$305
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings