Assessment Year | 2013 |
---|---|
Principal Product | Plastic Automotive Parts |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3999: Manufacturing Industries, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 160 |
Plant Area |
85,000
ft2
|
Annual Production | 3,500,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $413,656 | 6,258,120 |
kWh
|
$0.066 |
Electricity Demand | $154,749 | 15,189 |
kW-mo/yr
|
$10.19 |
Electricity Fees | $(-54,492.0) | - |
|
- |
Natural Gas | $5,925 | 703 |
MMBtu
|
$8.43 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $106,178 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,531 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $862 | $50 |
$658
9,972
kWh
|
$204
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,327 | $3,526 |
$689
10,440
kWh
|
$638
-
kW-mo/yr
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $775 | $835 |
$592
8,976
kWh
|
$183
-
kW-mo/yr
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,294 | $27,232 |
$10,920
165,600
kWh
|
$3,374
-
kW-mo/yr
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,752 | $10,856 |
$2,150
32,500
kWh
|
$602
-
kW-mo/yr
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,151 | $64,014 |
$3,936
59,640
kWh
|
$1,215
-
kW-mo/yr
|
- | |
07 | 2.7224: Reduce space conditioning during non-working hours | $6,774 | $500 |
$6,774
104,897
kWh
|
- | - | |
08 | 2.8112: Combine utility meters | $71,348 | $9,384 | - | - | $71,348 | |
09 | 4.812: Apply for investment incentives | $305 | - | - | - | $305 | |
10 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,590 | $6,000 |
$1,979
29,992
kWh
|
$611
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $106,178 | $122,397 |
$27,698
422,017
kWh
|
$6,827
-
kW-mo/yr
|
$71,653 | ||
TOTAL IMPLEMENTED | $10,531 | $6,550 |
$9,411
144,861
kWh
|
$815
-
kW-mo/yr
|
$305 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs