Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,692

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MA0372 #06 Y:1996 Install / repair insulation on steam lines $1,195 $645
MA0372 #05 Y:1996 Use synthetic lubricant $1,687 -
MA0372 #04 Y:1996 Recover waste heat from equipment $6,420 $9,000
MA0372 #03 Y:1996 Install compressor air intakes in coolest locations $2,149 $341
MA0372 #02 Y:1996 Eliminate or reduce compressed air usage $4,515 $822
MA0372 #01 Y:1996 Install dry sprinkler system or other method to reduce heating requirements $25,870 $11,700
MA0366 #08 Y:1996 Utilize a less expensive cooling method $435 $250
MA0366 #07 Y:1996 Use adjustable frequency drive or multiple speed motors on existing system $2,093 $4,910
MA0366 #06 Y:1996 Recover and reuse cooling water $1,421 $1,471
MA0366 #05 Y:1996 Install compressor air intakes in coolest locations $1,474 $350
MA0366 #04 Y:1996 Use cooling tower or economizer to replace chiller cooling $5,919 $9,000
MA0366 #03 Y:1996 Utilize higher efficiency lamps and/or ballasts $31,893 $20,255
MA0366 #02 Y:1996 Optimize plant power factor $11,369 $9,450
MA0366 #01 Y:1996 Recover waste heat from equipment $1,638 -
MA0368 #06 Y:1996 Install / repair insulation on condensate lines $285 $460
MA0368 #05 Y:1996 Replace electrically-operated equipment with fossil fuel equipment $2,042 $2,804
MA0368 #04 Y:1996 Repair or replace steam traps $1,990 $868
MA0368 #03 Y:1996 Utilize higher efficiency lamps and/or ballasts $2,509 $11,189
MA0368 #02 Y:1996 Use cooling tower water instead of refrigeration $8,710 $25,500
MA0368 #01 Y:1996 Treat and reuse rinse waters $17,190 $12,000