ITAC Assessment: MA0368
ITAC logo
ITAC Assessment: MA0368
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Printed circuit boards
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 55,000
ft2
Annual Production 140,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,625 1,019,930
kWh
Electricity Demand $23,270 2,242
kW-mo/yr
Electricity Fees $7,646 -
Natural Gas $82,286 14,682
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,726 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,784

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings
01 3.4113: Treat and reuse rinse waters $17,190 $12,000 - - $17,190
-
Tgal
02 2.2612: Use cooling tower water instead of refrigeration $8,710 $25,500 $1,030
60,375
kWh
- $7,680
-
Tgal
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,509 $11,189 $2,509
57,737
kWh
- -
04 2.2113: Repair or replace steam traps $1,990 $868 - $1,990
-
MMBtu
-
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,042 $2,804 $3,562
80,305
kWh
$(-1,520.0)
-
MMBtu
-
06 2.2122: Install / repair insulation on condensate lines $285 $460 $285
14,947
kWh
- -
TOTAL RECOMMENDED $32,726 $52,821 $7,386
213,364
kWh
$470
-
MMBtu
$24,870
-
Tgal
TOTAL IMPLEMENTED $4,784 $12,517 $2,794
72,684
kWh
$1,990
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs