Assessment Year | 2013 |
---|---|
Principal Product | Marine Propellers |
NAICS | 331512: Steel Investment Foundries |
SIC | 3324: Steel Investment Foundries |
Sales Range | $10 M to 50M |
# of Employees | 92 |
Plant Area |
62,000
ft2
|
Annual Production | 40,000
pieces
|
Production Hrs. Annual | 5,880
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $152,339 | 2,898,466 |
kWh
|
$0.053 |
Electricity Demand | $98,990 | 9,724 |
kW-mo/yr
|
$10.18 |
Natural Gas | $71,757 | 9,123 |
MMBtu
|
$7.87 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $58,838 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,773 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Other Gas Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 4.812: Apply for investment incentives | $4,545 | - | - | - | - | - |
$4,545
-
MMBtu
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,822 | - |
$1,822
50,611
kWh
|
- | - | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $446 | - |
$446
12,397
kWh
|
- | - | - | - | |
04 | 2.2511: Insulate bare equipment | $17,755 | $1,700 | - | - | - |
$17,755
-
MMBtu
|
- | |
05 | 2.7135: Install occupancy sensors | $1,962 | $107 |
$1,962
33,196
kWh
|
- | - | - | - | |
06 | 2.2511: Insulate bare equipment | $1,488 | $430 | - | - | - |
$1,488
-
MMBtu
|
- | |
07 | 2.4322: Use or replace with energy efficient substitutes | $571 | $221 |
$571
15,867
kWh
|
- | - | - | - | |
08 | 2.2511: Insulate bare equipment | $103 | $70 | - | - | - |
$103
-
MMBtu
|
- | |
09 | 2.2437: Recover waste heat from equipment | $2,108 | $1,795 | - | - | - |
$2,108
-
MMBtu
|
- | |
10 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,207 | $2,916 |
$1,207
8,820
kWh
|
- | - | - | - | |
11 | 2.7313: Recycle air for heating, ventilation and air conditioning | $18,512 | $51,858 |
$2,125
79,298
kWh
|
$2,821
-
kW-mo/yr
|
- |
$13,566
-
MMBtu
|
- | |
12 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,469 | $15,876 |
$3,023
112,813
kWh
|
$2,446
-
kW-mo/yr
|
- | - | - | |
13 | 2.3212: Optimize plant power factor | $2,850 | $8,526 | - | - | $2,850 | - | - | |
TOTAL RECOMMENDED | $58,838 | $83,499 |
$11,156
313,002
kWh
|
$5,267
-
kW-mo/yr
|
$2,850 |
$35,020
-
MMBtu
|
$4,545
-
MMBtu
|
||
TOTAL IMPLEMENTED | $19,773 | $26,525 |
$7,824
224,884
kWh
|
$2,446
-
kW-mo/yr
|
$2,850 |
$2,108
-
MMBtu
|
$4,545
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Other Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs