ITAC Assessment: LL0334
ITAC logo
ITAC Assessment: LL0334
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Tire Bladder
NAICS 326291: Rubber Product Manufacturing for Mechanical Use
SIC 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 200,000
ft2
Annual Production 177,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $588,983 7,440,048
kWh
Electricity Demand $109,920 18,615
kW-mo/yr
Electricity Fees $45,827 -
Natural Gas $313,139 58,054
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $465,195 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2135: Repair and eliminate steam leaks $295,797 $2,920 - - $295,797
-
MMBtu
02 2.2441: Preheat boiler makeup water with waste process heat $113,009 $24,500 - - $113,009
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $50,263 $9,960 $44,900
567,200
kWh
$5,363
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,974 $9,555 $2,974
37,670
kWh
- -
05 2.2511: Insulate bare equipment $1,325 $570 - - $1,325
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $522 $630 $474
5,992
kWh
$48
-
kW-mo/yr
-
07 2.7111: Reduce illumination to minimum necessary levels $603 $290 $603
7,618
kWh
- -
08 2.6211: Conserve energy by efficient use of vending machines $664 $646 $593
7,466
kWh
$71
-
kW-mo/yr
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $38 $19 $38
477
kWh
- -
TOTAL RECOMMENDED $465,195 $49,090 $49,582
626,423
kWh
$5,482
-
kW-mo/yr
$410,131
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs