Assessment Year | 2010 |
---|---|
Principal Product | Tire Bladder |
NAICS | 326291: Rubber Product Manufacturing for Mechanical Use |
SIC | 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
200,000
ft2
|
Annual Production | 177,000
pieces
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $588,983 | 7,440,048 |
kWh
|
$0.079 |
Electricity Demand | $109,920 | 18,615 |
kW-mo/yr
|
$5.90 |
Electricity Fees | $45,827 | - |
|
- |
Natural Gas | $313,139 | 58,054 |
MMBtu
|
$5.39 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $465,195 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2135: Repair and eliminate steam leaks | $295,797 | $2,920 | - | - |
$295,797
-
MMBtu
|
|
02 | 2.2441: Preheat boiler makeup water with waste process heat | $113,009 | $24,500 | - | - |
$113,009
-
MMBtu
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $50,263 | $9,960 |
$44,900
567,200
kWh
|
$5,363
-
kW-mo/yr
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,974 | $9,555 |
$2,974
37,670
kWh
|
- | - | |
05 | 2.2511: Insulate bare equipment | $1,325 | $570 | - | - |
$1,325
-
MMBtu
|
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $522 | $630 |
$474
5,992
kWh
|
$48
-
kW-mo/yr
|
- | |
07 | 2.7111: Reduce illumination to minimum necessary levels | $603 | $290 |
$603
7,618
kWh
|
- | - | |
08 | 2.6211: Conserve energy by efficient use of vending machines | $664 | $646 |
$593
7,466
kWh
|
$71
-
kW-mo/yr
|
- | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $38 | $19 |
$38
477
kWh
|
- | - | |
TOTAL RECOMMENDED | $465,195 | $49,090 |
$49,582
626,423
kWh
|
$5,482
-
kW-mo/yr
|
$410,131
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs