Assessment Year | 1996 |
---|---|
Principal Product | solar panel technology and equipment |
NAICS |
n/a
|
SIC | 3674: Semiconductors and Related Devices |
Sales Range | $10 M to 50M |
# of Employees | 140 |
Plant Area |
72,000
ft2
|
Annual Production | 2,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $600,876 | 6,534,291 |
kWh
|
$0.092 |
Electricity Demand | $148,923 | 10,901 |
kW-mo/yr
|
$13.66 |
Electricity Fees | $22,737 | - |
|
- |
Natural Gas | $56,522 | 3,750 |
MMBtu
|
$15.07 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $56,242 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,843 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $1,638 | - | - | - | - |
$1,638
-
MMBtu
|
- | |
02 | 2.3212: Optimize plant power factor | $11,369 | $9,450 | - | - | $11,369 | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $31,893 | $20,255 |
$30,986
366,354
kWh
|
$907
-
kW-mo/yr
|
- | - | - | |
04 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $5,919 | $9,000 |
$5,919
91,735
kWh
|
- | - | - | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $1,474 | $350 |
$1,309
8,206
kWh
|
$165
-
kW-mo/yr
|
- | - | - | |
06 | 3.4115: Recover and reuse cooling water | $1,421 | $1,471 | - | - | - | - |
$1,421
-
Tgal
|
|
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,093 | $4,910 |
$2,093
35,756
kWh
|
- | - | - | - | |
08 | 2.2628: Utilize a less expensive cooling method | $435 | $250 |
$435
6,741
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $56,242 | $45,686 |
$40,742
508,792
kWh
|
$1,072
-
kW-mo/yr
|
$11,369 |
$1,638
-
MMBtu
|
$1,421
-
Tgal
|
||
TOTAL IMPLEMENTED | $12,843 | $9,800 |
$1,309
8,206
kWh
|
$165
-
kW-mo/yr
|
$11,369 | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs