ITAC Assessment: MA0366
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product solar panel technology and equipment
NAICS
n/a
SIC 3674: Semiconductors and Related Devices
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 72,000
ft2
Annual Production 2,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $600,876 6,534,291
kWh
Electricity Demand $148,923 10,901
kW-mo/yr
Electricity Fees $22,737 -
Natural Gas $56,522 3,750
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,242 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,843

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings
01 2.2437: Recover waste heat from equipment $1,638 - - - - $1,638
-
MMBtu
-
02 2.3212: Optimize plant power factor $11,369 $9,450 - - $11,369 - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $31,893 $20,255 $30,986
366,354
kWh
$907
-
kW-mo/yr
- - -
04 2.2614: Use cooling tower or economizer to replace chiller cooling $5,919 $9,000 $5,919
91,735
kWh
- - - -
05 2.4221: Install compressor air intakes in coolest locations $1,474 $350 $1,309
8,206
kWh
$165
-
kW-mo/yr
- - -
06 3.4115: Recover and reuse cooling water $1,421 $1,471 - - - - $1,421
-
Tgal
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,093 $4,910 $2,093
35,756
kWh
- - - -
08 2.2628: Utilize a less expensive cooling method $435 $250 $435
6,741
kWh
- - - -
TOTAL RECOMMENDED $56,242 $45,686 $40,742
508,792
kWh
$1,072
-
kW-mo/yr
$11,369 $1,638
-
MMBtu
$1,421
-
Tgal
TOTAL IMPLEMENTED $12,843 $9,800 $1,309
8,206
kWh
$165
-
kW-mo/yr
$11,369 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs