ITAC Assessment: AR0138
ITAC logo
ITAC Assessment: AR0138
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Pumps
NAICS
n/a
SIC 3561: Pumps and Pumping Equipment
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 102,000
ft2
Annual Production 120,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $109,211 3,343,787
kWh
Electricity Demand $56,984 8,442
kW-mo/yr
Natural Gas $3,265 511
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,413 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,679

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,160 $120 $4,421
133,939
kWh
$1,739
-
kW-mo/yr
- - -
02 2.4221: Install compressor air intakes in coolest locations $798 $110 $573
17,292
kWh
$225
-
kW-mo/yr
- - -
03 2.7111: Reduce illumination to minimum necessary levels $465 $120 $329
9,965
kWh
$136
-
kW-mo/yr
- - -
04 2.4133: Use most efficient type of electric motors $367 $615 $251
7,620
kWh
$116
-
kW-mo/yr
- - -
05 2.2437: Recover waste heat from equipment $6,014 $998 $6,014
182,298
kWh
- - - -
06 2.2511: Insulate bare equipment $1,276 $182 $1,276
38,687
kWh
- - - -
07 3.4111: Use closed cycle process to minimize waste water production $5,107 $8,000 - $(-114.0)
-
kW-mo/yr
- $5,628
-
lb
$(-407.0)
08 3.6193: Install equipment (eg compactor) to reduce disposal costs $5,864 $5,900 $(-154.0)
(-4,689)
kWh
$(-243.0)
-
kW-mo/yr
$6,732
-
gal
- $(-471.0)
09 4.513: Re-arrange equipment layout to reduce labor costs $2,411 $1,595 - - - - $2,411
10 4.441: Install automatic packing equipment $951 $2,000 - - - - $951
TOTAL RECOMMENDED $29,413 $19,640 $12,710
385,112
kWh
$1,859
-
kW-mo/yr
$6,732
-
gal
$5,628
-
lb
$2,484
TOTAL IMPLEMENTED $10,679 $2,632 $6,277
190,211
kWh
$1,991
-
kW-mo/yr
- - $2,411
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs