ITAC Assessment: UD0160
ITAC logo
ITAC Assessment: UD0160
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product CRYOGENIC EQUIPMENT
NAICS
n/a
SIC 3569: General Industrial Machinery and Equipment, Not Elsewhere
Sales Range $10
M
to 50
M
# of Employees 230
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,500
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $263,401 4,699,883
kWh
Natural Gas $85,707 13,274
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $57,285 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $57,285

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3511: Use plant owned transformers or lease transformers $26,076 $20,000 $26,076
-
kWh
-
02 2.2443: Re-use or recycle hot or cold process exhaust air $2,657 $2,000 $3,538
60,375
kWh
$(-881.0)
-
MMBtu
03 2.7221: Lower temperature during the winter season and vice-versa $13,357 $1,400 $13,357
342,028
kWh
-
04 2.6121: Reduce hot water temperature to the minimum required $280 $200 - $280
-
MMBtu
05 2.6212: Turn off equipment during breaks, reduce operating time $6,689 - $886
27,550
kWh
$5,803
-
MMBtu
06 2.2437: Recover waste heat from equipment $1,825 $551 $402
6,741
kWh
$1,423
-
MMBtu
07 2.7142: Utilize higher efficiency lamps and/or ballasts $6,401 $7,500 $7,202
90,270
kWh
$(-801.0)
-
MMBtu
TOTAL RECOMMENDED $57,285 $31,651 $51,461
526,964
kWh
$5,824
-
MMBtu
TOTAL IMPLEMENTED $57,285 $31,651 $51,461
526,964
kWh
$5,824
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs