83
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| HO0214 #10 Y:1999 | 10 | 1999 | Replace existing equipment with more suitable substitutes | $25,000 | $800 | |
| HO0214 #09 Y:1999 | 09 | 1999 | Begin a practice of predictive / preventative maintenance | $1,800 | $120 | |
| HO0214 #08 Y:1999 | 08 | 1999 | Improve space comfort conditioning | $1,980 | $1,030 | |
| HO0214 #07 Y:1999 | 07 | 1999 | Change operating conditions | $7,654 | $20,000 | |
| HO0214 #06 Y:1999 | 06 | 1999 | Cover open tanks | $3,955 | $4,450 | |
| HO0214 #05 Y:1999 | 05 | 1999 | Insulate bare equipment | $1,927 | $2,160 | |
| HO0214 #04 Y:1999 | 04 | 1999 | Use properly designed and sized hvac equipment | $9,653 | - | |
| HO0214 #03 Y:1999 | 03 | 1999 | Insulate bare equipment | $3,454 | $3,900 | |
| HO0214 #02 Y:1999 | 02 | 1999 | Install compressor air intakes in coolest locations | $723 | $1,500 | |
| HO0214 #01 Y:1999 | 01 | 1999 | Install occupancy sensors | $1,313 | $1,600 | |
| HO0215 #06 Y:1999 | 06 | 1999 | Optimize lot sizes to reduce inventory carrying costs | $261 | $200 | n/a |
| HO0215 #05 Y:1999 | 05 | 1999 | Begin a practice of predictive / preventative maintenance | $6,000 | $12,000 | n/a |
| HO0215 #04 Y:1999 | 04 | 1999 | Install shelves / racks to utilize unused space | $7,500 | $12,000 | n/a |
| HO0215 #03 Y:1999 | 03 | 1999 | Combine utility meters | $4,474 | $3,000 | n/a |
| HO0215 #02 Y:1999 | 02 | 1999 | Keep doors and windows shut when not on use | $1,513 | - | n/a |
| HO0215 #01 Y:1999 | 01 | 1999 | Utilize higher efficiency lamps and/or ballasts | $6,818 | $10,083 | n/a |
| HO0212 #10 Y:1999 | 10 | 1999 | Add equipment/ operators to reduce production bottleneck | $6,379 | $500 | |
| HO0212 #09 Y:1999 | 09 | 1999 | Move product using mechanical means | $4,590 | $12,000 | |
| HO0212 #08 Y:1999 | 08 | 1999 | Begin a practice of predictive / preventative maintenance | $11,437 | $2,882 | |
| HO0212 #07 Y:1999 | 07 | 1999 | Change operating conditions | $8,954 | $20,000 |