ITAC Assessment: HO0212
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Electric Platers
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $5
M
to 10
M
# of Employees 61
Plant Area 36,000
ft2
Annual Production 15,000
lb
Production Hrs. Annual 6,120
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $111,922 1,871,336
kWh
Electricity Demand $46,585 5,201
kW-mo/yr
Electricity Fees $(-2,472.0) -
Natural Gas $11,525 2,765
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,592 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,079

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,162 $9,938 $3,990
66,823
kWh
$1,172
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,715 $400 $3,715
62,134
kWh
- - -
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $10,284 $7,500 $10,979
183,763
kWh
$3,224
-
kW-mo/yr
$(-3,919.0)
-
MMBtu
-
04 2.2511: Insulate bare equipment $2,104 $6,840 $2,104
35,170
kWh
- - -
05 2.2414: Use waste heat from hot flue gases to preheat $2,419 $1,467 - - $2,419
-
MMBtu
-
06 2.2136: Install / repair insulation on steam lines $1,548 $2,882 - - $1,548
-
MMBtu
-
07 4.632: Change operating conditions $8,954 $20,000 - - - $8,954
08 4.611: Begin a practice of predictive / preventative maintenance $11,437 $2,882 - - - $11,437
09 4.423: Move product using mechanical means $4,590 $12,000 - - - $4,590
10 4.111: Add equipment/ operators to reduce production bottleneck $6,379 $500 - - - $6,379
TOTAL RECOMMENDED $56,592 $64,409 $20,788
347,890
kWh
$4,396
-
kW-mo/yr
$48
-
MMBtu
$31,360
TOTAL IMPLEMENTED $23,079 $6,664 $3,715
62,134
kWh
- $1,548
-
MMBtu
$17,816
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs