Assessment Year | 1999 |
---|---|
Principal Product | Electric Platers |
NAICS |
n/a
|
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $5 M to 10M |
# of Employees | 61 |
Plant Area |
36,000
ft2
|
Annual Production | 15,000
lb
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $111,922 | 1,871,336 |
kWh
|
$0.060 |
Electricity Demand | $46,585 | 5,201 |
kW-mo/yr
|
$8.96 |
Electricity Fees | $(-2,472.0) | - |
|
- |
Natural Gas | $11,525 | 2,765 |
MMBtu
|
$4.17 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $56,592 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,079 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,162 | $9,938 |
$3,990
66,823
kWh
|
$1,172
-
kW-mo/yr
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,715 | $400 |
$3,715
62,134
kWh
|
- | - | - | |
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $10,284 | $7,500 |
$10,979
183,763
kWh
|
$3,224
-
kW-mo/yr
|
$(-3,919.0)
-
MMBtu
|
- | |
04 | 2.2511: Insulate bare equipment | $2,104 | $6,840 |
$2,104
35,170
kWh
|
- | - | - | |
05 | 2.2414: Use waste heat from hot flue gases to preheat | $2,419 | $1,467 | - | - |
$2,419
-
MMBtu
|
- | |
06 | 2.2136: Install / repair insulation on steam lines | $1,548 | $2,882 | - | - |
$1,548
-
MMBtu
|
- | |
07 | 4.632: Change operating conditions | $8,954 | $20,000 | - | - | - | $8,954 | |
08 | 4.611: Begin a practice of predictive / preventative maintenance | $11,437 | $2,882 | - | - | - | $11,437 | |
09 | 4.423: Move product using mechanical means | $4,590 | $12,000 | - | - | - | $4,590 | |
10 | 4.111: Add equipment/ operators to reduce production bottleneck | $6,379 | $500 | - | - | - | $6,379 | |
TOTAL RECOMMENDED | $56,592 | $64,409 |
$20,788
347,890
kWh
|
$4,396
-
kW-mo/yr
|
$48
-
MMBtu
|
$31,360 | ||
TOTAL IMPLEMENTED | $23,079 | $6,664 |
$3,715
62,134
kWh
|
- |
$1,548
-
MMBtu
|
$17,816 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs