Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,675

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
HO0238 #10 Y:2000 Change procedures / equipment / operating conditions $10,092 $6,500
HO0238 #09 Y:2000 Re-arrange equipment layout to reduce handling costs $1,313 $400
HO0238 #08 Y:2000 Move product using mechanical means $1,220 $40
HO0238 #07 Y:2000 Begin a practice of predictive / preventative maintenance $840 $250
HO0238 #06 Y:2000 Begin a practice of predictive / preventative maintenance $840 $200
HO0238 #05 Y:2000 Eliminate leaks in inert gas and compressed air lines/ valves $5,502 $600
HO0238 #04 Y:2000 Eliminate or reduce compressed air usage $2,736 $1,200
HO0238 #03 Y:2000 Reduce the pressure of compressed air to the minimum required $702 $60
HO0238 #02 Y:2000 Install compressor air intakes in coolest locations $736 $800
HO0238 #01 Y:2000 Utilize higher efficiency lamps and/or ballasts $845 $2,289
HO0237 #09 Y:2000 Eliminate leaks in water lines and valves $1,980 $200
HO0237 #08 Y:2000 Improve space comfort conditioning $2,520 $1,000
HO0237 #07 Y:2000 Add equipment/ operators to reduce production bottleneck $9,464 $7,000
HO0237 #06 Y:2000 Optimize production lot sizes and inventories $2,880 $480
HO0237 #05 Y:2000 Eliminate old stock and modify inventory control $7,800 $5,000
HO0237 #04 Y:2000 Install system to collect scrap $5,780 $6,240
HO0237 #03 Y:2000 Improve space comfort conditioning $8,731 $1,000
HO0237 #02 Y:2000 Condense operation into one building $91,200 $1,000
HO0237 #01 Y:2000 Utilize higher efficiency lamps and/or ballasts $9,410 $11,135
HO0236 #12 Y:2000 Regrind, reuse, or sell scrap plastic parts $175 $500