ITAC Assessment: HO0237
ITAC logo
ITAC Assessment: HO0237
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Sweaters
NAICS
n/a
SIC 2533:
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 140,000
ft2
Annual Production 1,380,000
pieces
Production Hrs. Annual 2,340
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $49,630 817,116
kWh
Electricity Demand $74,529 3,114
kW-mo/yr
Natural Gas $65,409 6,232
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $139,765 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,520

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $9,410 $11,135 $5,792
95,545
kWh
$3,618
-
kW-mo/yr
-
02 4.512: Condense operation into one building $91,200 $1,000 - - $91,200
03 4.424: Improve space comfort conditioning $8,731 $1,000 - - $8,731
04 4.444: Install system to collect scrap $5,780 $6,240 - - $5,780
05 4.322: Eliminate old stock and modify inventory control $7,800 $5,000 - - $7,800
06 4.321: Optimize production lot sizes and inventories $2,880 $480 - - $2,880
07 4.111: Add equipment/ operators to reduce production bottleneck $9,464 $7,000 - - $9,464
08 4.424: Improve space comfort conditioning $2,520 $1,000 - - $2,520
09 3.4154: Eliminate leaks in water lines and valves $1,980 $200 - - $1,980
TOTAL RECOMMENDED $139,765 $33,055 $5,792
95,545
kWh
$3,618
-
kW-mo/yr
$130,355
TOTAL IMPLEMENTED $2,520 $1,000 - - $2,520
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs