Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT0996 #08 Y:2025 Use solar heat to make electricty $69,446 $597,013
GT0996 #07 Y:2025 Replace existing hvac unit with high efficiency model $61,043 $300,000
GT0996 #06 Y:2025 Use most efficient type of electric motors $929 $3,845
GT0996 #05 Y:2025 Eliminate or reduce compressed air usage $2,898 $9,000
GT0996 #04 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $5,931 $15,250
GT0996 #03 Y:2025 Use most efficient type of electric motors $1,956 $3,845
GT0996 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $3,373 $2,600
GT0996 #01 Y:2025 Conserve energy by efficient use of vending machines $245 $90
GT0989 #09 Y:2024 Use solar heat to make electricty $29,893 $435,677
GT0989 #08 Y:2024 Use heat in flue gases to preheat products or materials $20,031 $100,000
GT0989 #07 Y:2024 Use heat in flue gases to preheat products or materials $23,815 $115,000
GT0989 #06 Y:2024 Use most efficient type of electric motors $1,216 $5,400
GT0989 #05 Y:2024 Insulate bare equipment $442 $1,852
GT0989 #04 Y:2024 Use most efficient type of electric motors $430 $1,777
GT0989 #03 Y:2024 Use or replace with energy efficient substitutes $42,149 $150,000
GT0989 #02 Y:2024 Re-arrange equipment layout to reduce handling costs $200 $100
GT0989 #01 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $20,407 $2,600
GT0937 #05 Y:2019 Use solar heat to make electricty $17,740 $158,500
GT0937 #04 Y:2019 Recover waste heat from equipment $32,772 $100,000
GT0937 #03 Y:2019 Optimize plant power factor $10,618 $38,920