ITAC Assessment: GT0996
ITAC logo
ITAC Assessment: GT0996
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Printed Circuit Assemblies
NAICS 334418: Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3672: Printed Circuit Boards
Sales Range $50
M
to 100
M
# of Employees 208
Plant Area 70,000
ft2
Annual Production 5,354
units
Production Hrs. Annual 4,329
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $295,342 2,217,015
kWh
TOTAL YEARLY COSTS $295,342
RECOMMENDED SAVINGS* $145,821 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.6211: Conserve energy by efficient use of vending machines $245 $90 $245
1,885
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,373 $2,600 $6,273
48,252
kWh
$(-2,900.0) -
03 2.4133: Use most efficient type of electric motors $1,956 $3,845 $1,956
15,047
kWh
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,931 $15,250 $5,931
45,627
kWh
- -
05 2.4239: Eliminate or reduce compressed air usage $2,898 $9,000 $2,898
22,299
kWh
- -
06 2.4133: Use most efficient type of electric motors $929 $3,845 $929
7,143
kWh
- -
07 2.7232: Replace existing hvac unit with high efficiency model $61,043 $300,000 $25,043
192,639
kWh
- $36,000
08 2.9114: Use solar heat to make electricty $69,446 $597,013 $69,446
521,303
kWh
- -
TOTAL RECOMMENDED $145,821 $931,643 $112,721
854,195
kWh
$(-2,900.0) $36,000
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings