Assessment Year | 2025 |
---|---|
Principal Product | Printed Circuit Assemblies |
NAICS | 334418: Printed Circuit Assembly (Electronic Assembly) Manufacturing |
SIC | 3672: Printed Circuit Boards |
Sales Range | $50 M to 100M |
# of Employees | 208 |
Plant Area |
70,000
ft2
|
Annual Production | 5,354
units
|
Production Hrs. Annual | 4,329
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $295,342 | 2,217,015 |
kWh
|
$0.13 |
TOTAL YEARLY COSTS | $295,342 | |||
RECOMMENDED SAVINGS* | $145,821 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.6211: Conserve energy by efficient use of vending machines | $245 | $90 |
$245
1,885
kWh
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,373 | $2,600 |
$6,273
48,252
kWh
|
$(-2,900.0) | - | |
03 | 2.4133: Use most efficient type of electric motors | $1,956 | $3,845 |
$1,956
15,047
kWh
|
- | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,931 | $15,250 |
$5,931
45,627
kWh
|
- | - | |
05 | 2.4239: Eliminate or reduce compressed air usage | $2,898 | $9,000 |
$2,898
22,299
kWh
|
- | - | |
06 | 2.4133: Use most efficient type of electric motors | $929 | $3,845 |
$929
7,143
kWh
|
- | - | |
07 | 2.7232: Replace existing hvac unit with high efficiency model | $61,043 | $300,000 |
$25,043
192,639
kWh
|
- | $36,000 | |
08 | 2.9114: Use solar heat to make electricty | $69,446 | $597,013 |
$69,446
521,303
kWh
|
- | - | |
TOTAL RECOMMENDED | $145,821 | $931,643 |
$112,721
854,195
kWh
|
$(-2,900.0) | $36,000 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs