Assessment Year | 2025 |
---|---|
Principal Product | Large seam-welded pipes |
NAICS | 331210: Iron and Steel Pipe and Tube Manufacturing from Purchased Steel |
SIC | 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills |
Sales Range | $100 M to 500M |
# of Employees | 120 |
Plant Area |
81,500
ft2
|
Annual Production | 16,501
units
|
Production Hrs. Annual | 1,614
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,284,948 | 16,216,221 |
kWh
|
$0.079 |
Natural Gas | $198,954 | 53,899 |
MMBtu
|
$3.69 |
TOTAL YEARLY COSTS | $1,483,902 | |||
RECOMMENDED SAVINGS* | $138,583 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $20,407 | $2,600 |
$23,307
295,027
kWh
|
- | $(-2,900.0) | |
02 | 4.514: Re-arrange equipment layout to reduce handling costs | $200 | $100 |
$200
2,519
kWh
|
- | - | |
03 | 2.4322: Use or replace with energy efficient substitutes | $42,149 | $150,000 |
$42,149
533,534
kWh
|
- | - | |
04 | 2.4133: Use most efficient type of electric motors | $430 | $1,777 |
$430
5,449
kWh
|
- | - | |
05 | 2.2511: Insulate bare equipment | $442 | $1,852 |
$442
5,591
kWh
|
- | - | |
06 | 2.4133: Use most efficient type of electric motors | $1,216 | $5,400 |
$1,216
15,384
kWh
|
- | - | |
07 | 2.2424: Use heat in flue gases to preheat products or materials | $23,815 | $115,000 | - |
$23,815
-
MMBtu
|
- | |
08 | 2.2424: Use heat in flue gases to preheat products or materials | $20,031 | $100,000 | - |
$20,031
-
MMBtu
|
- | |
09 | 2.9114: Use solar heat to make electricty | $29,893 | $435,677 |
$29,893
377,251
kWh
|
- | - | |
TOTAL RECOMMENDED | $138,583 | $812,406 |
$97,637
1,234,754
kWh
|
$43,846
-
MMBtu
|
$(-2,900.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs