matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Roasted nuts and peanut butter manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| GT0949 #07 Y:2020 | 07 | 2020 | Optimize plant power factor | $1,392 | $5,106 | |
| GT0949 #06 Y:2020 | 06 | 2020 | Turn off equipment during breaks, reduce operating time | $461 | $425 | |
| GT0949 #05 Y:2020 | 05 | 2020 | Eliminate leaks in inert gas and compressed air lines/ valves | $13,586 | $4,500 | |
| GT0949 #04 Y:2020 | 04 | 2020 | Install timers and/or thermostats | $2,159 | $451 | |
| GT0949 #03 Y:2020 | 03 | 2020 | Recharge batteries on during off-peak demand periods | $2,978 | $400 | |
| GT0949 #02 Y:2020 | 02 | 2020 | Apply for tax-free status for energy purchases | $19,356 | $2,000 | |
| GT0949 #01 Y:2020 | 01 | 2020 | Reduce the pressure of compressed air to the minimum required | $4,422 | $400 | |
| GT0860 #09 Y:2008 | 09 | 2008 | Utilize higher efficiency lamps and/or ballasts | $8,361 | $14,795 | |
| GT0860 #08 Y:2008 | 08 | 2008 | Utilize higher efficiency lamps and/or ballasts | $10,084 | $16,350 | |
| GT0860 #07 Y:2008 | 07 | 2008 | Use heat from boiler blowdown to preheat boiler feed water | $2,199 | $4,250 | |
| GT0860 #06 Y:2008 | 06 | 2008 | Use cooling tower or economizer to replace chiller cooling | $5,213 | $12,000 | |
| GT0860 #05 Y:2008 | 05 | 2008 | Use most efficient type of electric motors | $3,419 | $7,066 | |
| GT0860 #04 Y:2008 | 04 | 2008 | Replace hydraulic / pneumatic equipment with electric equipment | $4,140 | $6,750 | |
| GT0860 #03 Y:2008 | 03 | 2008 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,730 | $1,000 | |
| GT0860 #02 Y:2008 | 02 | 2008 | Turn off equipment during breaks, reduce operating time | $4,661 | $1,000 | |
| GT0860 #01 Y:2008 | 01 | 2008 | Install / repair insulation on steam lines | $10,513 | $6,050 | |
| GT0841 #09 Y:2007 | 09 | 2007 | Minimize operation of equipment maintained in standby condition | $1,780 | $15,000 | |
| GT0841 #08 Y:2007 | 08 | 2007 | Schedule use of elevators to conserve energy | $2,640 | $15,000 | |
| GT0841 #07 Y:2007 | 07 | 2007 | Use most efficient type of electric motors | $5,453 | $9,501 | |
| GT0841 #06 Y:2007 | 06 | 2007 | Eliminate or reduce compressed air usage | $1,623 | $1,000 |