Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,101

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
DS0141 #08 Y:1999 Contract a wood pallet recycling company $6,612 $400
DS0141 #07 Y:1999 Change procedures / equipment / operating conditions $77,215 -
DS0141 #06 Y:1999 Meter recycled water (to reduce sewer charges) $3,184 $1,200
DS0141 #05 Y:1999 Upgrade obsolete equipment $13,679 $32,000
DS0141 #04 Y:1999 Eliminate leaks in inert gas and compressed air lines/ valves $4,348 $900
DS0141 #03 Y:1999 Install compressor air intakes in coolest locations $1,031 $700
DS0141 #02 Y:1999 Optimize plant power factor $4,260 $4,500
DS0141 #01 Y:1999 Preheat combustion air with waste heat $10,285 $24,040
DS0140 #07 Y:1999 Pay bills on time to avoid late fees $70 -
DS0140 #06 Y:1999 Begin a practice of predictive / preventative maintenance $244 -
DS0140 #05 Y:1999 Install shelves / racks to utilize unused space $3,003 $1,760
DS0140 #04 Y:1999 Recover and reuse waste material $641 $60
DS0140 #03 Y:1999 Insulate bare equipment $416 $25
DS0140 #02 Y:1999 Utilize higher efficiency lamps and/or ballasts $1,697 $6,324
DS0140 #01 Y:1999 Optimize plant power factor $1,918 $1,190
DS0139 #06 Y:1999 Install shelves / racks to utilize unused space $2,633 $7,000
DS0139 #05 Y:1999 Consider use / purchase of bulk materials where possible $1,515 $3,300
DS0139 #04 Y:1999 Meter recycled water (to reduce sewer charges) $595 $800
DS0139 #03 Y:1999 Eliminate or reduce compressed air usage $1,693 $391
DS0139 #02 Y:1999 Install compressor air intakes in coolest locations $882 $500