Assessment Year | 1999 |
---|---|
Principal Product | Thermoplastic Molded Parts |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 10 |
Plant Area |
16,000
ft2
|
Annual Production | 36,000,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Minnesota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $25,531 | 742,966 |
kWh
|
$0.034 |
Electricity Demand | $18,379 | 2,448 |
kW-mo/yr
|
$7.51 |
Electricity Fees | $3,412 | - |
|
- |
Natural Gas | $1,787 | 319 |
MMBtu
|
$5.60 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $7,989 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,629 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $1,918 | $1,190 | - | - | $1,918 | - | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,697 | $6,324 |
$1,032
30,481
kWh
|
$665
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.2511: Insulate bare equipment | $416 | $25 |
$416
12,309
kWh
|
- | - | - | - | - | |
04 | 3.5311: Recover and reuse waste material | $641 | $60 |
$110
3,224
kWh
|
- | - |
$196
-
lb
|
$335 | - | |
05 | 4.515: Install shelves / racks to utilize unused space | $3,003 | $1,760 | - | - | - | - | - | $3,003 | |
06 | 4.611: Begin a practice of predictive / preventative maintenance | $244 | - | - | - | - | - | $244 | - | |
07 | 4.821: Pay bills on time to avoid late fees | $70 | - | - | - | - | - | - | $70 | |
TOTAL RECOMMENDED | $7,989 | $9,359 |
$1,558
46,014
kWh
|
$665
-
kW-mo/yr
|
$1,918 |
$196
-
lb
|
$579 | $3,073 | ||
TOTAL IMPLEMENTED | $2,629 | $1,250 |
$110
3,224
kWh
|
- | $1,918 |
$196
-
lb
|
$335 | $70 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs