ITAC Assessment: DS0140
ITAC logo
ITAC Assessment: DS0140
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Thermoplastic Molded Parts
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 10
Plant Area 16,000
ft2
Annual Production 36,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $25,531 742,966
kWh
Electricity Demand $18,379 2,448
kW-mo/yr
Electricity Fees $3,412 -
Natural Gas $1,787 319
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,989 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,629

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.3212: Optimize plant power factor $1,918 $1,190 - - $1,918 - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,697 $6,324 $1,032
30,481
kWh
$665
-
kW-mo/yr
- - - -
03 2.2511: Insulate bare equipment $416 $25 $416
12,309
kWh
- - - - -
04 3.5311: Recover and reuse waste material $641 $60 $110
3,224
kWh
- - $196
-
lb
$335 -
05 4.515: Install shelves / racks to utilize unused space $3,003 $1,760 - - - - - $3,003
06 4.611: Begin a practice of predictive / preventative maintenance $244 - - - - - $244 -
07 4.821: Pay bills on time to avoid late fees $70 - - - - - - $70
TOTAL RECOMMENDED $7,989 $9,359 $1,558
46,014
kWh
$665
-
kW-mo/yr
$1,918 $196
-
lb
$579 $3,073
TOTAL IMPLEMENTED $2,629 $1,250 $110
3,224
kWh
- $1,918 $196
-
lb
$335 $70
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs