ITAC Assessment: DS0141
ITAC logo
ITAC Assessment: DS0141
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Aluminum Die Castings
NAICS
n/a
SIC 3363: Aluminum Die-Castings
Sales Range $10
M
to 50
M
# of Employees 155
Plant Area 80,300
ft2
Annual Production 12,000,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $202,891 5,992,087
kWh
Electricity Demand $103,041 14,232
kW-mo/yr
Electricity Fees $5,261 -
Natural Gas $288,514 99,091
MMBtu
LPG $10,842 2,934
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $540,172 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,787

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.2442: Preheat combustion air with waste heat $10,285 $24,040 - - - $10,285
-
MMBtu
- - -
02 2.3212: Optimize plant power factor $4,260 $4,500 - - $4,260 - - - -
03 2.4221: Install compressor air intakes in coolest locations $1,031 $700 $760
22,274
kWh
$271
-
kW-mo/yr
- - - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,348 $900 $3,208
94,373
kWh
$1,140
-
kW-mo/yr
- - - - -
05 2.4321: Upgrade obsolete equipment $13,679 $32,000 - - - $13,679
-
MMBtu
- - -
06 3.4116: Meter recycled water (to reduce sewer charges) $3,184 $1,200 - - - - $3,184
-
Tgal
- -
07 3.1191: Change procedures / equipment / operating conditions $77,215 - - - - - - - $77,215
08 3.5316: Contract a wood pallet recycling company $6,612 $400 - - - - - $6,612 -
09 4.211: Consider use / purchase of bulk materials where possible $3,240 $1,000 - - - - - $3,240 -
10 3.2176: Increase use of automation $416,318 $440,000 - - - - - $416,318 -
TOTAL RECOMMENDED $540,172 $504,740 $3,968
116,647
kWh
$1,411
-
kW-mo/yr
$4,260 $23,964
-
MMBtu
$3,184
-
Tgal
$426,170 $77,215
TOTAL IMPLEMENTED $36,787 $63,340 $3,968
116,647
kWh
$1,411
-
kW-mo/yr
$4,260 $23,964
-
MMBtu
$3,184
-
Tgal
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs