Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

55

matching recommendations
$
$
ARC Waste minimization / pollution prevention
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
DL0261 #03 Y:2025 Change procedures / equipment / operating conditions $9,021 $7,950
DL0259 #01 Y:2025 Change procedures / equipment / operating conditions $45,458 $19,000
DL0251 #07 Y:2024 Reprocess spent oils on site for re-use $1,561 $16,500
DL0247 #07 Y:2024 Meter waste water $34,580 $145
DL0244 #05 Y:2024 Meter waste water $7,907 $2,000
DL0243 #03 Y:2024 Eliminate/reduce an operation $2,346 $520
DL0231 #06 Y:2023 Maintain machines to reduce leaks $441,845 $39,600
DL0231 #05 Y:2023 Maintain machines to reduce leaks $132,876 $34,600
DL0228 #01 Y:2023 Carefully control water level in mass finishing equipment $4,024 $700
DL0225 #07 Y:2023 Improve handling practices $25,825 $10,000
DL0223 #01 Y:2023 Eliminate/reduce an operation $9,025 -
DL0222 #01 Y:2023 Use flow control valves on equipment to optimize water use $1,009 $42
DL0219 #09 Y:2023 Replace city water with recycled water via cooling tower $51,679 $50,000
DL0211 #06 Y:2022 Recover and reuse cooling water $52,650 $50,000
DL0211 #01 Y:2022 Improve process control to prevent spills of material $4,080 $450
DL0210 #06 Y:2022 Eliminate leaks in water lines and valves $17,648 $50,000
DL0205 #05 Y:2022 Eliminate/reduce an operation $2,351 -
DL0202 #04 Y:2022 Burn waste oil for heat $12,350 $5,000
DL0199 #04 Y:2021 Eliminate leaks in water lines and valves $2,657 $1,514
DL0198 #04 Y:2021 Use flow control valves on equipment to optimize water use $16,090 $1,500