ITAC Assessment: DL0277
ITAC logo
ITAC Assessment: DL0277
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product thermoformed plastic packaging components
NAICS 326160: Plastics Bottle Manufacturing
SIC 3085: Plastics Bottles
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area 260,000
ft2
Annual Production 3,000,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $733,743 15,923,982
kWh
Electricity Demand $47,823 17,753
kW-mo/yr
Electricity Fees $1,779 -
Natural Gas $25,665 2,403
MMBtu
TOTAL YEARLY COSTS $809,010
RECOMMENDED SAVINGS* $190,989 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.6218: Turn off equipment when not in use $13,189 - $13,189
160,836
kWh
02 2.7314: Reduce ventilation air $24,876 $4,500 $24,876
303,365
kWh
03 2.2522: Isolate hot or cold equipment $23,577 $20,000 $23,577
287,525
kWh
04 2.7243: Improve air circulation with destratification fans / other methods $87,180 $60,000 $87,180
1,063,174
kWh
05 2.6218: Turn off equipment when not in use $6,227 - $6,227
75,941
kWh
06 2.2511: Insulate bare equipment $7,188 $4,600 $7,188
87,660
kWh
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $28,752 $20,897 $28,752
350,640
kWh
TOTAL RECOMMENDED $190,989 $109,997 $190,989
2,329,141
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs