ITAC Assessment: DL0278
ITAC logo
ITAC Assessment: DL0278
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product plastic cups
NAICS 326160: Plastics Bottle Manufacturing
SIC 3085: Plastics Bottles
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area 24,000
ft2
Annual Production 3,000,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,507,610 19,058,500
kWh
Electricity Demand $123,302 43,428
kW-mo/yr
Electricity Fees $1,779 -
TOTAL YEARLY COSTS $1,632,691
RECOMMENDED SAVINGS* $63,688 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.6231: Utilize controls to operate equipment only when needed $41,090 - $41,090
477,789
kWh
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,373 $10,500 $13,373
155,500
kWh
03 2.4221: Install compressor air intakes in coolest locations $3,168 $3,200 $3,168
36,841
kWh
04 2.6231: Utilize controls to operate equipment only when needed $403 $1,118 $403
4,692
kWh
05 2.2511: Insulate bare equipment $5,654 $3,450 $5,654
65,745
kWh
TOTAL RECOMMENDED $63,688 $18,268 $63,688
740,567
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs