296
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| CC0050 #05 Y:2025 | 05 | 2025 | Utilize daylight whenever possible in lieu of artificial light | $193 | $570 |
n/a
|
| CC0050 #04 Y:2025 | 04 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,053 | $840 |
n/a
|
| CC0050 #03 Y:2025 | 03 | 2025 | Insulate bare equipment | $13,610 | $9,048 |
n/a
|
| CC0050 #02 Y:2025 | 02 | 2025 | Utilize controls to operate equipment only when needed | $1,494 | $3,000 |
n/a
|
| CC0050 #01 Y:2025 | 01 | 2025 | Use cooling tower water instead of refrigeration | $5,563 | $16,000 |
n/a
|
| CC0049 #06 Y:2025 | 06 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $6,604 | $1,000 |
n/a
|
| CC0049 #05 Y:2025 | 05 | 2025 | Reduce space conditioning during non-working hours | $10,741 | $4,750 |
n/a
|
| CC0049 #04 Y:2025 | 04 | 2025 | Close holes and openings in building such as broken windows | $4,838 | $20,000 |
n/a
|
| CC0049 #03 Y:2025 | 03 | 2025 | Recover waste heat from equipment | $1,641 | $4,550 |
n/a
|
| CC0049 #02 Y:2025 | 02 | 2025 | Reduce the pressure of compressed air to the minimum required | $2,512 | $3,080 |
n/a
|
| CC0049 #01 Y:2025 | 01 | 2025 | Utilize higher efficiency lamps and/or ballasts | $3,661 | $6,374 |
n/a
|
| CC0048 #06 Y:2025 | 06 | 2025 | Use solar heat to make electricty | $36,494 | $215,901 |
n/a
|
| CC0048 #05 Y:2025 | 05 | 2025 | Reduce the pressure of compressed air to the minimum required | $873 | - |
n/a
|
| CC0048 #04 Y:2025 | 04 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $621 | $1,000 |
n/a
|
| CC0048 #03 Y:2025 | 03 | 2025 | Use / purchase optimum sized compressor | $1,356 | $5,000 |
n/a
|
| CC0048 #02 Y:2025 | 02 | 2025 | Reduce illumination to minimum necessary levels | $2,607 | $53 |
n/a
|
| CC0048 #01 Y:2025 | 01 | 2025 | Utilize higher efficiency lamps and/or ballasts | $6,577 | $13,513 |
n/a
|
| CC0046 #05 Y:2025 | 05 | 2025 | Use cooling tower water instead of refrigeration | $1,753 | $1,480 |
n/a
|
| CC0046 #04 Y:2025 | 04 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $8,255 | $25,000 |
n/a
|
| CC0046 #03 Y:2025 | 03 | 2025 | Use computer programs to optimize hvac performance | $1,082 | $2,000 |
n/a
|