ITAC Assessment: CC0050
ITAC logo
ITAC Assessment: CC0050
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Cooling Tower Fill, Eliminators, Louvers
NAICS 326121: Unlaminated Plastics Profile Shape Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 58,000
ft2
Annual Production 30,000
units
Production Hrs. Annual 5,460
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $88,465 1,875,679
kWh
Electricity Demand $88,366 7,123
kW-mo/yr
Electricity Fees $26,917 -
Natural Gas $14,792 1,190
MMBtu
TOTAL YEARLY COSTS $218,540
RECOMMENDED SAVINGS* $22,913 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.2612: Use cooling tower water instead of refrigeration $5,563 $16,000 $3,947
83,980
kWh
$1,616
-
kW-mo/yr
02 2.6231: Utilize controls to operate equipment only when needed $1,494 $3,000 $1,494
31,784
kWh
-
03 2.2511: Insulate bare equipment $13,610 $9,048 $13,610
289,582
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,053 $840 $2,053
43,680
kWh
-
05 2.7121: Utilize daylight whenever possible in lieu of artificial light $193 $570 $120
2,548
kWh
$73
-
kW-mo/yr
TOTAL RECOMMENDED $22,913 $29,458 $21,224
451,574
kWh
$1,689
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs