ITAC Assessment: CC0049
ITAC logo
ITAC Assessment: CC0049
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Conveyors and integrated metal chip disposal systems
NAICS 333515: Cutting Tool and Machine Tool Accessory Manufacturing
SIC 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices
Sales Range $10
M
to 50
M
# of Employees 137
Plant Area 74,400
ft2
Annual Production 4,000
units
Production Hrs. Annual 4,420
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $99,449 1,060,800
kWh
Electricity Demand $16,109 3,308
kW-mo/yr
Electricity Fees $3,859 -
Natural Gas $10,845 1,126
MMBtu
TOTAL YEARLY COSTS $130,262
RECOMMENDED SAVINGS* $29,997 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,661 $6,374 $3,095
32,926
kWh
$566
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,512 $3,080 $2,202
23,426
kWh
$310
-
kW-mo/yr
-
03 2.2437: Recover waste heat from equipment $1,641 $4,550 - - $1,641
-
MMBtu
04 2.7444: Close holes and openings in building such as broken windows $4,838 $20,000 - - $4,838
-
MMBtu
05 2.7224: Reduce space conditioning during non-working hours $10,741 $4,750 $10,741
114,261
kWh
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,604 $1,000 $6,604
70,278
kWh
- -
TOTAL RECOMMENDED $29,997 $39,754 $22,642
240,891
kWh
$875
-
kW-mo/yr
$6,479
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs