ITAC Assessment: CC0048
ITAC logo
ITAC Assessment: CC0048
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Stone Countertop Fabrication
NAICS 327991: Cut Stone and Stone Product Manufacturing
SIC 3281: Cut Stone and Stone Products
Sales Range $10
M
to 50
M
# of Employees 48
Plant Area 20,000
ft2
Annual Production 160,000
units
Production Hrs. Annual 3,380
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $46,101 374,960
kWh
Electricity Fees $5,135 -
TOTAL YEARLY COSTS $51,236
RECOMMENDED SAVINGS* $48,528 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,577 $13,513 $6,577
53,468
kWh
02 2.7111: Reduce illumination to minimum necessary levels $2,607 $53 $2,607
21,193
kWh
03 2.4226: Use / purchase optimum sized compressor $1,356 $5,000 $1,356
11,030
kWh
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $621 $1,000 $621
5,051
kWh
05 2.4231: Reduce the pressure of compressed air to the minimum required $873 - $873
7,098
kWh
06 2.9114: Use solar heat to make electricty $36,494 $215,901 $36,494
296,701
kWh
TOTAL RECOMMENDED $48,528 $235,467 $48,528
394,541
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs