Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,391

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
BD0256 #04 Y:2004 Reduce illumination to minimum necessary levels $8,310 $645
BD0256 #03 Y:2004 Reduce the pressure of compressed air to the minimum required $10,608 -
BD0256 #02 Y:2004 Recover waste heat from equipment $62,641 $14,500
BD0256 #01 Y:2004 Recover waste heat from equipment $146,428 $60,000
BD0257 #11 Y:2004 Automate payroll system $5,824 $2,500
BD0257 #10 Y:2004 Utilize higher efficiency lamps and/or ballasts $254 $217
BD0257 #09 Y:2004 Reduce the pressure of compressed air to the minimum required $573 -
BD0257 #08 Y:2004 Install compressor air intakes in coolest locations $640 $500
BD0257 #07 Y:2004 Eliminate or reduce compressed air usage $3,979 -
BD0257 #06 Y:2004 Direct warmest air to combustion intake $4,187 $2,000
BD0257 #05 Y:2004 Install turbulators $5,680 $1,200
BD0257 #04 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $5,777 $500
BD0257 #03 Y:2004 Utilize higher efficiency lamps and/or ballasts $7,533 $2,160
BD0257 #02 Y:2004 Utilize higher efficiency lamps and/or ballasts $44,732 $36,505
BD0257 #01 Y:2004 Reduce illumination to minimum necessary levels $43,626 $5,040
BD0255 #15 Y:2003 Pay bills on time to avoid late fees $2,190 -
BD0255 #14 Y:2003 Automate payroll system $6,240 $3,000
BD0255 #13 Y:2003 Reschedule plant operations or reduce load to avoid peaks $12,428 $2,000
BD0255 #12 Y:2003 Install occupancy sensors $570 $150
BD0255 #11 Y:2003 Utilize higher efficiency lamps and/or ballasts $739 $995