ITAC Assessment: BD0257
ITAC logo
ITAC Assessment: BD0257
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Alcohol Beverages(Liquor)
NAICS 424820: Wine and Distilled Alcoholic Beverage Merchant Wholesalers
SIC 5182: Wine and Distilled Alcoholic Beverages
Sales Range $100
M
to 500
M
# of Employees 435
Plant Area 738,000
ft2
Annual Production 1,000,000
Tgal
Production Hrs. Annual 2,080
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $361,959 5,324,859
kWh
Natural Gas $285,980 54,182
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $122,805 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $70,286

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7111: Reduce illumination to minimum necessary levels $43,626 $5,040 $40,989
602,790
kWh
- $856 $1,781
02 2.7142: Utilize higher efficiency lamps and/or ballasts $44,732 $36,505 $39,317
578,203
kWh
- $1,993 $3,422
03 2.7142: Utilize higher efficiency lamps and/or ballasts $7,533 $2,160 $5,404
79,470
kWh
- $1,183 $946
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,777 $500 $5,777
84,965
kWh
- - -
05 2.1222: Install turbulators $5,680 $1,200 - $5,680
-
MMBtu
- -
06 2.1213: Direct warmest air to combustion intake $4,187 $2,000 $(-108.0)
(-1,618)
kWh
$4,295
-
MMBtu
- -
07 2.4239: Eliminate or reduce compressed air usage $3,979 - $3,979
58,514
kWh
- - -
08 2.4221: Install compressor air intakes in coolest locations $640 $500 $640
9,404
kWh
- - -
09 2.4231: Reduce the pressure of compressed air to the minimum required $573 - $573
8,431
kWh
- - -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $254 $217 $158
2,330
kWh
- $40 $56
11 4.447: Automate payroll system $5,824 $2,500 - - $5,824 -
TOTAL RECOMMENDED $122,805 $50,622 $96,729
1,422,489
kWh
$9,975
-
MMBtu
$9,896 $6,205
TOTAL IMPLEMENTED $70,286 $11,740 $51,850
762,486
kWh
$9,975
-
MMBtu
$6,680 $1,781
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs