ITAC Assessment: CO0399
ITAC logo
ITAC Assessment: CO0399
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product custom signs
NAICS
n/a
SIC 3993: Signs and Advertising Specialties
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area 22,400
ft2
Annual Production 358
pieces
Production Hrs. Annual 2,730
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $8,811 433,763
kWh
Electricity Demand $20,943 1,504
kW-mo/yr
Electricity Fees $151 -
Natural Gas $9,316 2,934
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $61,437 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $47,140

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $937 $2,504 $213
12,016
kWh
$724
-
kW-mo/yr
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,240 $600 $330
18,464
kWh
$910
-
kW-mo/yr
- - - -
03 2.7447: Install vinyl strip / high speed / air curtain doors $490 $1,660 - - $490
-
MMBtu
- - -
04 2.1116: Improve combustion control capability $320 $750 - - $320
-
MMBtu
- - -
05 3.7131: Use a rag recycle service $480 - - - - - $480 -
06 4.624: Hire additional personnel to reduce changeout time $45,100 $13,100 - - - $(-46,800.0) - $91,900
07 4.652: Replace existing equipment with more suitable substitutes $12,870 $1,100 $(-70.0)
(-3,810)
kWh
$(-80.0)
-
kW-mo/yr
$20
-
MMBtu
- - $13,000
TOTAL RECOMMENDED $61,437 $19,714 $473
26,670
kWh
$1,554
-
kW-mo/yr
$830
-
MMBtu
$(-46,800.0) $480 $104,900
TOTAL IMPLEMENTED $47,140 $14,450 $330
18,464
kWh
$910
-
kW-mo/yr
$320
-
MMBtu
$(-46,800.0) $480 $91,900
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs