ITAC Assessment: UD0241
ITAC logo
ITAC Assessment: UD0241
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product SPECIALTY CHEMICALS
NAICS
n/a
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 12,000,000
lb
Production Hrs. Annual 8,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $442,231 9,798,945
kWh
Natural Gas $695,535 193,582
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $91,222 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,974

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4239: Eliminate or reduce compressed air usage $8,400 $600 $8,400
350,234
kWh
- -
02 2.2437: Recover waste heat from equipment $1,575 $2,000 - $1,575
-
MMBtu
-
03 2.6212: Turn off equipment during breaks, reduce operating time $9,254 $15,000 $9,254
385,698
kWh
- -
04 2.6212: Turn off equipment during breaks, reduce operating time $32,901 $22,000 - $32,901
-
MMBtu
-
05 2.1212: Operate boilers on high fire setting $7,000 $5,000 - $7,000
-
MMBtu
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $8,574 $1,000 - $8,574
-
MMBtu
-
07 2.2414: Use waste heat from hot flue gases to preheat $12,040 $15,000 - $12,040
-
MMBtu
-
08 2.2511: Insulate bare equipment $1,546 $2,200 - $1,546
-
MMBtu
-
09 2.3511: Use plant owned transformers or lease transformers $9,932 $22,000 $11,894
-
kWh
- $(-1,962.0)
TOTAL RECOMMENDED $91,222 $84,800 $29,548
735,932
kWh
$63,636
-
MMBtu
$(-1,962.0)
TOTAL IMPLEMENTED $16,974 $1,600 $8,400
350,234
kWh
$8,574
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs