Assessment Year | 2012 |
---|---|
Principal Product | Steel Bridges |
NAICS | 331110: Iron and Steel Mills and Ferroalloy Manufacturing |
SIC | 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills |
Sales Range | $100 M to 500M |
# of Employees | 20 |
Plant Area |
195,000
ft2
|
Annual Production | 13,000
ton
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $508,676 | 4,924,750 |
kWh
|
$0.10 |
Electricity Demand | $62,681 | 13,717 |
kW-mo/yr
|
$4.57 |
Natural Gas | $290,722 | 38,776 |
MMBtu
|
$7.50 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $193,115 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $50,818 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $59,232 | $1,300 |
$54,881
548,812
kWh
|
$4,351
-
kW-mo/yr
|
- | - | |
02 | 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air | $42,903 | $73,485 | - | - |
$42,903
-
MMBtu
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $36,201 | $136,500 |
$32,448
324,480
kWh
|
$2,852
-
kW-mo/yr
|
- | $901 | |
04 | 2.7496: Install partitions to reduce size of conditioned space | $24,579 | - | - | - |
$24,579
-
MMBtu
|
- | |
05 | 2.5194: Redesign process | $20,100 | - |
$20,100
201,000
kWh
|
- | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,156 | $12,800 |
$2,634
26,338
kWh
|
$558
-
kW-mo/yr
|
- | $(-36.0) | |
07 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $3,134 | $2,500 | - |
$3,134
-
kW-mo/yr
|
- | - | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,005 | $1,000 |
$2,763
27,627
kWh
|
$242
-
kW-mo/yr
|
- | - | |
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $805 | $125 |
$526
5,262
kWh
|
$279
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $193,115 | $227,710 |
$113,352
1,133,519
kWh
|
$11,416
-
kW-mo/yr
|
$67,482
-
MMBtu
|
$865 | ||
TOTAL IMPLEMENTED | $50,818 | $3,500 |
$22,863
228,627
kWh
|
$3,376
-
kW-mo/yr
|
$24,579
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs