Assessment Year | 1997 |
---|---|
Principal Product | Threads |
NAICS |
n/a
|
SIC | 2282: Yarn Texturizing, Throwing, Twisting, and Winding Mills |
Sales Range | $1 M to 5M |
# of Employees | 67 |
Plant Area |
100,000
ft2
|
Annual Production | 250,000
units
|
Production Hrs. Annual | 6,600
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $136,838 | 3,048,652 |
kWh
|
$0.045 |
Electricity Demand | $23,275 | 6,552 |
kW-mo/yr
|
$3.55 |
Electricity Fees | $31,139 | - |
|
- |
Natural Gas | $26,072 | 6,192 |
MMBtu
|
$4.21 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,200 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,065 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,362 | $11,311 |
$4,680
104,338
kWh
|
$682
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $3,635 | $1,878 | - | - |
$3,635
-
MMBtu
|
- | - | - | |
03 | 2.2136: Install / repair insulation on steam lines | $723 | $385 | - | - |
$723
-
MMBtu
|
- | - | - | |
04 | 2.1223: Install smaller boiler (increase high fire duty cycle) | $4,370 | $5,000 | - | - |
$4,370
-
MMBtu
|
- | - | - | |
05 | 4.432: Cross-train personnel to avoid lost time | $480 | $100 | - | - | - | $480 | - | - | |
06 | 3.4116: Meter recycled water (to reduce sewer charges) | $1,130 | $100 | - | - | - | - | $1,130 | - | |
07 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $12,500 | $2,000 | - | - | - | - | - | $12,500 | |
TOTAL RECOMMENDED | $28,200 | $20,774 |
$4,680
104,338
kWh
|
$682
-
kW-mo/yr
|
$8,728
-
MMBtu
|
$480 | $1,130 | $12,500 | ||
TOTAL IMPLEMENTED | $19,065 | $13,796 |
$4,680
104,338
kWh
|
$682
-
kW-mo/yr
|
$723
-
MMBtu
|
$480 | - | $12,500 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs