ITAC Assessment: MI0285
ITAC logo
ITAC Assessment: MI0285
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Manifolds
NAICS 332912: Fluid Power Valve and Hose Fitting Manufacturing
SIC 3492: Fluid Power Valves and Hose Fittings
Sales Range $50
M
to 100
M
# of Employees 267
Plant Area 83,000
ft2
Annual Production 52,000
pieces
Production Hrs. Annual 8,008
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $248,501 5,457,335
kWh
Electricity Demand $101,845 8,173
kW-mo/yr
Electricity Fees $21,261 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $116,420 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $51,932

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.2514: Cover open tanks $36,126 $25,100 $36,126
785,343
kWh
-
02 2.7425: Clean or color roof to reduce solar load $22,640 $52,920 $22,640
492,174
kWh
-
03 2.7221: Lower temperature during the winter season and vice-versa $15,400 $80 $15,400
334,680
kWh
-
04 2.7292: Lower ceiling to reduce conditioned space $13,892 $76,650 $13,892
301,998
kWh
-
05 2.4323: Use optimum size and capacity equipment $8,325 $4,691 $5,185
112,725
kWh
$3,140
-
kW-mo/yr
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,096 $1,660 $7,485
162,710
kWh
$611
-
kW-mo/yr
07 2.4239: Eliminate or reduce compressed air usage $6,621 $5,370 $2,737
57,015
kWh
$3,884
-
kW-mo/yr
08 2.2437: Recover waste heat from equipment $3,310 $6,660 $2,338
51,920
kWh
$972
-
kW-mo/yr
09 2.4231: Reduce the pressure of compressed air to the minimum required $2,010 $40 $1,262
27,425
kWh
$748
-
kW-mo/yr
TOTAL RECOMMENDED $116,420 $173,171 $107,065
2,325,990
kWh
$9,355
-
kW-mo/yr
TOTAL IMPLEMENTED $51,932 $129,650 $51,932
1,128,852
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs