Assessment Year | 2015 |
---|---|
Principal Product | soft toys |
NAICS | 339930: Doll, Toy, and Game Manufacturing |
SIC | 3944: Games, Toys, and Children's Vehicles, Except Dolls and Bicycles |
Sales Range | $10 M to 50M |
# of Employees | 95 |
Plant Area |
104,800
ft2
|
Annual Production | 1,200,000
pieces
|
Production Hrs. Annual | 3,850
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $119,070 | 2,178,549 |
kWh
|
$0.055 |
Electricity Demand | $73,619 | 9,526 |
kW-mo/yr
|
$7.73 |
Natural Gas | $30,484 | 2,601 |
MMBtu
|
$11.72 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $71,336 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 4.512: Condense operation into one building | $14,201 | $28,800 |
$11,071
202,566
kWh
|
$3,130
-
kW-mo/yr
|
- | |
02 | 4.512: Condense operation into one building | $19,376 | $2,500 |
$7,019
128,415
kWh
|
$1,352
-
kW-mo/yr
|
$11,005
-
MMBtu
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $31,470 | $116,250 |
$21,849
399,438
kWh
|
$9,621
-
kW-mo/yr
|
- | |
04 | 2.7135: Install occupancy sensors | $1,508 | $440 |
$1,508
27,590
kWh
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $279 | $20 |
$194
3,554
kWh
|
$85
-
kW-mo/yr
|
- | |
06 | 2.7425: Clean or color roof to reduce solar load | $4,502 | $27,000 |
$3,126
57,200
kWh
|
$1,376
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $71,336 | $175,010 |
$44,767
818,763
kWh
|
$15,564
-
kW-mo/yr
|
$11,005
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs