ITAC Assessment: NC0029
ITAC logo
ITAC Assessment: NC0029
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product hoses
NAICS
n/a
SIC 3052: Rubber and Plastics Hose and Belting
Sales Range $10
M
to 50
M
# of Employees 72
Plant Area 74,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,250
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $229,242 3,847,011
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,545 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,476

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.3112: Store heated/ cooled water for use during peak demand periods $11,457 $153,000 $11,457
49,531
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,131 $480 $1,131
18,757
kWh
03 2.3192: Use fossil fuel powered generator during peak demand periods $14,345 $40,000 $14,345
-
kWh
04 2.7111: Reduce illumination to minimum necessary levels $3,050 $520 $3,050
50,996
kWh
05 2.2511: Insulate bare equipment $562 $378 $562
9,379
kWh
TOTAL RECOMMENDED $30,545 $194,378 $30,545
128,663
kWh
TOTAL IMPLEMENTED $15,476 $40,480 $15,476
18,757
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs