ITAC Assessment: MA0320
ITAC logo
ITAC Assessment: MA0320
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product speakers
NAICS
n/a
SIC 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds
Sales Range $10
M
to 50
M
# of Employees 240
Plant Area 60,000
ft2
Annual Production 100,000,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $302,906 3,834,408
kWh
LPG $5,933 829
MMBtu
Fuel Oil #2 $1,529 293
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,045 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,381

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Liquid (haz) Savings
01 2.3212: Optimize plant power factor $7,911 $8,698 $7,911
-
kWh
-
02 2.2511: Insulate bare equipment $8,056 $4,620 $8,056
101,993
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,381 $700 $7,381
95,252
kWh
-
04 2.7135: Install occupancy sensors $533 $208 $533
6,741
kWh
-
05 3.8142: Distill contaminated solvents for reuse $4,164 $23,530 - $4,164
-
gal
TOTAL RECOMMENDED $28,045 $37,756 $23,881
203,986
kWh
$4,164
-
gal
TOTAL IMPLEMENTED $7,381 $700 $7,381
95,252
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs