| Assessment Year | 1988 |
|---|---|
| Principal Product | PELLETIZED ANIMAL FEED |
| NAICS |
n/a
|
| SIC | 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats |
| Sales Range | $10 M to 50M |
| # of Employees | 52 |
| Plant Area |
n/a
|
| Annual Production | 250,000
ton
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $284,556 | 4,978,019 |
kWh
|
$0.057 |
| Natural Gas | $142,926 | 35,154 |
MMBtu
|
$4.07 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $23,328 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $9,305 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,721 | $1,636 |
$3,721
65,064
kWh
|
- | - | |
| 02 | 2.6232: Install set-back timers | $6,030 | - |
$6,030
105,510
kWh
|
- | - | |
| 03 | 2.4133: Use most efficient type of electric motors | $1,911 | $1,222 |
$1,911
33,411
kWh
|
- | - | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,607 | - |
$3,607
63,013
kWh
|
- | - | |
| 05 | 2.7261: Install timers and/or thermostats | $588 | $200 |
$588
10,258
kWh
|
- | - | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $398 | $370 |
$398
7,034
kWh
|
- | - | |
| 07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,948 | - | - |
$3,448
-
MMBtu
|
$(-500.0) | |
| 08 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $441 | $160 | - |
$441
-
MMBtu
|
- | |
| 09 | 2.2414: Use waste heat from hot flue gases to preheat | $3,684 | $8,000 | - |
$3,684
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $23,328 | $11,588 |
$16,255
284,290
kWh
|
$7,573
-
MMBtu
|
$(-500.0) | ||
| TOTAL IMPLEMENTED | $9,305 | $1,752 |
$5,916
103,458
kWh
|
$3,889
-
MMBtu
|
$(-500.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs