ITAC Assessment: AT0102
ITAC logo
ITAC Assessment: AT0102
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product PELLETIZED ANIMAL FEED
NAICS
n/a
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $10
M
to 50
M
# of Employees 52
Plant Area
n/a
Annual Production 250,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $284,556 4,978,019
kWh
Natural Gas $142,926 35,154
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,328 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,305

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,721 $1,636 $3,721
65,064
kWh
- -
02 2.6232: Install set-back timers $6,030 - $6,030
105,510
kWh
- -
03 2.4133: Use most efficient type of electric motors $1,911 $1,222 $1,911
33,411
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,607 - $3,607
63,013
kWh
- -
05 2.7261: Install timers and/or thermostats $588 $200 $588
10,258
kWh
- -
06 2.4221: Install compressor air intakes in coolest locations $398 $370 $398
7,034
kWh
- -
07 2.1233: Analyze flue gas for proper air/fuel ratio $2,948 - - $3,448
-
MMBtu
$(-500.0)
08 2.1131: Repair faulty insulation in furnaces, boilers, etc $441 $160 - $441
-
MMBtu
-
09 2.2414: Use waste heat from hot flue gases to preheat $3,684 $8,000 - $3,684
-
MMBtu
-
TOTAL RECOMMENDED $23,328 $11,588 $16,255
284,290
kWh
$7,573
-
MMBtu
$(-500.0)
TOTAL IMPLEMENTED $9,305 $1,752 $5,916
103,458
kWh
$3,889
-
MMBtu
$(-500.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs