ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
BD0494 #10 Y:2016 | 10 | 2016 | Install compressor air intakes in coolest locations | $260 | $600 |
n/a
|
BD0494 #09 Y:2016 | 09 | 2016 | Utilize energy-efficient belts and other improved mechanisms | $294 | $550 |
n/a
|
BD0494 #08 Y:2016 | 08 | 2016 | Utilize higher efficiency lamps and/or ballasts | $350 | $300 |
n/a
|
BD0494 #07 Y:2016 | 07 | 2016 | Reduce the pressure of compressed air to the minimum required | $803 | $21 |
n/a
|
BD0494 #06 Y:2016 | 06 | 2016 | Utilize higher efficiency lamps and/or ballasts | $1,456 | $3,960 |
n/a
|
BD0494 #05 Y:2016 | 05 | 2016 | Use most efficient type of electric motors | $1,978 | $4,040 |
n/a
|
BD0494 #04 Y:2016 | 04 | 2016 | Use photocell controls | $2,112 | $3,000 |
n/a
|
BD0494 #03 Y:2016 | 03 | 2016 | Install occupancy sensors | $2,169 | $1,950 |
n/a
|
BD0494 #02 Y:2016 | 02 | 2016 | Use radiant heater for spot heating | $5,446 | $12,000 |
n/a
|
BD0494 #01 Y:2016 | 01 | 2016 | Replace obsolete burners with more efficient ones | $6,894 | $18,000 |
n/a
|
BD0493 #08 Y:2016 | 08 | 2016 | Install compressor air intakes in coolest locations | $188 | $500 |
n/a
|
BD0493 #07 Y:2016 | 07 | 2016 | Install occupancy sensors | $925 | $1,050 |
n/a
|
BD0493 #06 Y:2016 | 06 | 2016 | Reduce the pressure of compressed air to the minimum required | $932 | $20 |
n/a
|
BD0493 #05 Y:2016 | 05 | 2016 | Recharge batteries on during off-peak demand periods | $2,280 | $50 |
n/a
|
BD0493 #04 Y:2016 | 04 | 2016 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,605 | $600 |
n/a
|
BD0493 #03 Y:2016 | 03 | 2016 | Analyze flue gas for proper air/fuel ratio | $3,620 | $6,000 |
n/a
|
BD0493 #02 Y:2016 | 02 | 2016 | Replace boiler | $7,259 | $14,000 |
n/a
|
BD0493 #01 Y:2016 | 01 | 2016 | Use radiant heater for spot heating | $17,520 | $1,900 |
n/a
|
BD0492 #11 Y:2016 | 11 | 2016 | Regrind, reuse, or sell scrap plastic parts | $225 | $200 |
n/a
|
BD0492 #10 Y:2016 | 10 | 2016 | Reschedule plant operations or reduce load to avoid peaks | $285 | $200 |
n/a
|