Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product injection Molded Plastic Parts
NAICS 326121: Unlaminated Plastics Profile Shape Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 100,000
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $215,895 3,420,707
kWh
Electricity Demand $49,279 7,317
kW-mo/yr
Electricity Fees $1,166 -
Natural Gas $2,401 415
MMBtu
Waste Disposal Costs
Water Usage $843 141
Tgal
Water Disposal $432 141
Tgal
Solid Waste (non-haz) $520 22,500
lb
TOTAL YEARLY COSTS $270,536
RECOMMENDED SAVINGS* $44,073 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $17,166 $21,060 $15,051
238,526
kWh
$2,115
-
kW-mo/yr
-
02 2.2511: Insulate bare equipment $10,912 $4,050 $9,716
153,986
kWh
$1,196
-
kW-mo/yr
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $8,352 $2,600 $7,328
116,129
kWh
$1,024
-
kW-mo/yr
-
04 2.6212: Turn off equipment during breaks, reduce operating time $3,305 $500 $1,851
29,327
kWh
$1,454
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,299 $6,032 $931
14,759
kWh
$368
-
kW-mo/yr
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,039 $20 $895
14,184
kWh
$144
-
kW-mo/yr
-
07 2.7135: Install occupancy sensors $476 $600 $160
2,529
kWh
$316
-
kW-mo/yr
-
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $529 $75 $439
6,964
kWh
$90
-
kW-mo/yr
-
09 2.4221: Install compressor air intakes in coolest locations $485 $1,200 $403
6,400
kWh
$82
-
kW-mo/yr
-
10 2.3131: Reschedule plant operations or reduce load to avoid peaks $285 $200 - $285
-
kW-mo/yr
-
11 3.5212: Regrind, reuse, or sell scrap plastic parts $225 $200 - - $225
-
lb
TOTAL RECOMMENDED $44,073 $36,537 $36,774
582,804
kWh
$7,074
-
kW-mo/yr
$225
-
lb
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs