Assessment Year | 2013 |
---|---|
Principal Product | Industrial multi-wall paper bags |
NAICS | 322220: Paper Bag and Coated and Treated Paper Manufacturing |
SIC | 2674: Uncoated Paper and Multiwall Bags |
Sales Range | $10 M to 50M |
# of Employees | 65 |
Plant Area |
98,565
ft2
|
Annual Production | 20,000,000
pieces
|
Production Hrs. Annual | 5,460
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $49,406 | 1,190,312 |
kWh
|
$0.042 |
Electricity Demand | $16,625 | 3,455 |
kW-mo/yr
|
$4.81 |
Electricity Fees | $9,708 | - |
|
- |
Natural Gas | $18,985 | 2,665 |
MMBtu
|
$7.13 |
LPG | $9,990 | 494 |
MMBtu
|
$20.21 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $20,210 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7231: Use radiant heater for spot heating | $9,498 | $14,512 |
$5,927
142,815
kWh
|
$1,509
-
kW-mo/yr
|
$2,062
-
MMBtu
|
- | - | - | |
02 | 2.8227: Adjust / maintain fork lift trucks for most efficient operation | $6,185 | $16,000 |
$(-2,072.0)
(-49,920)
kWh
|
$(-1,732.0)
-
kW-mo/yr
|
- |
$9,989
-
MMBtu
|
- | - | |
03 | 2.4133: Use most efficient type of electric motors | $1,832 | $4,800 |
$1,543
37,192
kWh
|
$289
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $1,312 | $500 |
$1,101
26,542
kWh
|
$211
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $793 | $2,777 |
$481
11,591
kWh
|
$286
-
kW-mo/yr
|
- | - | $7 | $19 | |
06 | 2.6214: Shut off pilots in standby equipment | $212 | $40 | - | - |
$212
-
MMBtu
|
- | - | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $378 | $20 |
$287
6,923
kWh
|
$91
-
kW-mo/yr
|
- | - | - | - | |
TOTAL RECOMMENDED | $20,210 | $38,649 |
$7,267
175,143
kWh
|
$654
-
kW-mo/yr
|
$2,274
-
MMBtu
|
$9,989
-
MMBtu
|
$7 | $19 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs