ITAC Assessment: BD0494
ITAC logo
ITAC Assessment: BD0494
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Agricultural Equipment
NAICS 333922: Conveyor and Conveying Equipment Manufacturing
SIC 3523: Farm Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 66
Plant Area 202,600
ft2
Annual Production 5,000
units
Production Hrs. Annual 2,340
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $109,293 2,109,033
kWh
Electricity Demand $84,581 9,846
kW-mo/yr
Electricity Fees $1,758 -
Natural Gas $95,466 23,330
MMBtu
TOTAL YEARLY COSTS $291,098
RECOMMENDED SAVINGS* $21,762 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.1221: Replace obsolete burners with more efficient ones $6,894 $18,000 - - $6,894
-
MMBtu
- -
02 2.7231: Use radiant heater for spot heating $5,446 $12,000 $1,025
19,793
kWh
$679
-
kW-mo/yr
$3,742
-
MMBtu
- -
03 2.7135: Install occupancy sensors $2,169 $1,950 $953
18,400
kWh
$1,216
-
kW-mo/yr
- - -
04 2.7134: Use photocell controls $2,112 $3,000 $838
16,182
kWh
$1,069
-
kW-mo/yr
- $137 $68
05 2.4133: Use most efficient type of electric motors $1,978 $4,040 $1,069
20,632
kWh
$909
-
kW-mo/yr
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,456 $3,960 $787
15,186
kWh
$669
-
kW-mo/yr
- - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $803 $21 $434
8,372
kWh
$369
-
kW-mo/yr
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $350 $300 $172
3,329
kWh
$40
-
kW-mo/yr
- $58 $80
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $294 $550 $164
3,159
kWh
$130
-
kW-mo/yr
- - -
10 2.4221: Install compressor air intakes in coolest locations $260 $600 $141
2,712
kWh
$119
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $21,762 $44,421 $5,583
107,765
kWh
$5,200
-
kW-mo/yr
$10,636
-
MMBtu
$195 $148
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs