ITAC Assessment: UA0276
ITAC logo
ITAC Assessment: UA0276
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Orthopedic Instruments and Implants
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 234
Plant Area 104,000
ft2
Annual Production 332,375
units
Production Hrs. Annual 6,120
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $471,127 6,026,700
kWh
Electricity Demand $157,980 11,711
kW-mo/yr
Electricity Fees $(-48,962.0) -
Natural Gas $3,045 2,022
MMBtu
TOTAL YEARLY COSTS $583,190
RECOMMENDED SAVINGS* $54,071 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,502

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $23,109 $57,867 $20,014
255,938
kWh
$5,045
-
kW-mo/yr
$(-1,950.0)
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,633 $8,591 $9,490
121,360
kWh
$2,040
-
kW-mo/yr
$(-897.0)
03 2.4231: Reduce the pressure of compressed air to the minimum required $5,956 $1,000 $5,390
68,920
kWh
$1,068
-
kW-mo/yr
$(-502.0)
04 2.7232: Replace existing hvac unit with high efficiency model $12,760 $35,064 $10,343
132,264
kWh
$3,494
-
kW-mo/yr
$(-1,077.0)
05 2.7261: Install timers and/or thermostats $1,613 $1,169 $1,749
22,364
kWh
- $(-136.0)
TOTAL RECOMMENDED $54,071 $103,691 $46,986
600,846
kWh
$11,647
-
kW-mo/yr
$(-4,562.0)
TOTAL IMPLEMENTED $46,502 $101,522 $39,847
509,562
kWh
$10,579
-
kW-mo/yr
$(-3,924.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs