Assessment Year | 2023 |
---|---|
Principal Product | Orthopedic Instruments and Implants |
NAICS | 339112: Surgical and Medical Instrument Manufacturing |
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 234 |
Plant Area |
104,000
ft2
|
Annual Production | 332,375
units
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $471,127 | 6,026,700 |
kWh
|
$0.078 |
Electricity Demand | $157,980 | 11,711 |
kW-mo/yr
|
$13.49 |
Electricity Fees | $(-48,962.0) | - |
|
- |
Natural Gas | $3,045 | 2,022 |
MMBtu
|
$1.51 |
TOTAL YEARLY COSTS | $583,190 | |||
RECOMMENDED SAVINGS* | $54,071 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $46,502 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $23,109 | $57,867 |
$20,014
255,938
kWh
|
$5,045
-
kW-mo/yr
|
$(-1,950.0) | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,633 | $8,591 |
$9,490
121,360
kWh
|
$2,040
-
kW-mo/yr
|
$(-897.0) | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,956 | $1,000 |
$5,390
68,920
kWh
|
$1,068
-
kW-mo/yr
|
$(-502.0) | |
04 | 2.7232: Replace existing hvac unit with high efficiency model | $12,760 | $35,064 |
$10,343
132,264
kWh
|
$3,494
-
kW-mo/yr
|
$(-1,077.0) | |
05 | 2.7261: Install timers and/or thermostats | $1,613 | $1,169 |
$1,749
22,364
kWh
|
- | $(-136.0) | |
TOTAL RECOMMENDED | $54,071 | $103,691 |
$46,986
600,846
kWh
|
$11,647
-
kW-mo/yr
|
$(-4,562.0) | ||
TOTAL IMPLEMENTED | $46,502 | $101,522 |
$39,847
509,562
kWh
|
$10,579
-
kW-mo/yr
|
$(-3,924.0) |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs