ITAC Assessment: UF0325
ITAC logo
ITAC Assessment: UF0325
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Lumber
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 82
Plant Area 400,000
ft2
Annual Production 48,000
thousand feet
Production Hrs. Annual 2,184
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $343,877 10,264,979
kWh
Electricity Demand $248,767 44,985
kW-mo/yr
Wood $1,281 1,095
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $178,116 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $88,011

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Wood Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7124: Make a practice of turning off lights when not needed $1,804 - $1,804
31,650
kWh
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,190 $6,999 $1,686
49,591
kWh
$1,504
-
kW-mo/yr
- - -
03 2.4156: Establish a preventative maintenance program $16,751 $9,663 $3,309
97,315
kWh
$3,696
-
kW-mo/yr
- $9,746 -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,308 $550 $1,356
24,630
kWh
- - $(-48.0) -
05 2.4231: Reduce the pressure of compressed air to the minimum required $3,686 - $3,686
64,658
kWh
- - - -
06 2.2511: Insulate bare equipment $1,281 $971 - - $1,281
-
MMBtu
- -
07 3.1291: Eliminate practice of mixing waste streams $38,880 $75,000 - - - - $38,880
08 4.448: Install automatic part storage / retreval system $80,640 $337,400 - - - $80,640 -
09 4.441: Install automatic packing equipment $30,576 $66,500 - - - $30,576 -
TOTAL RECOMMENDED $178,116 $497,083 $11,841
267,844
kWh
$5,200
-
kW-mo/yr
$1,281
-
MMBtu
$120,914 $38,880
TOTAL IMPLEMENTED $88,011 $151,163 $5,113
128,965
kWh
$3,696
-
kW-mo/yr
- $40,322 $38,880
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Wood Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs