Assessment Year | 2003 |
---|---|
Principal Product | Lumber |
NAICS |
n/a
|
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $10 M to 50M |
# of Employees | 82 |
Plant Area |
400,000
ft2
|
Annual Production | 48,000
thousand feet
|
Production Hrs. Annual | 2,184
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $343,877 | 10,264,979 |
kWh
|
$0.034 |
Electricity Demand | $248,767 | 44,985 |
kW-mo/yr
|
$5.53 |
Wood | $1,281 | 1,095 |
MMBtu
|
$1.17 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $178,116 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $88,011 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Wood Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7124: Make a practice of turning off lights when not needed | $1,804 | - |
$1,804
31,650
kWh
|
- | - | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,190 | $6,999 |
$1,686
49,591
kWh
|
$1,504
-
kW-mo/yr
|
- | - | - | |
03 | 2.4156: Establish a preventative maintenance program | $16,751 | $9,663 |
$3,309
97,315
kWh
|
$3,696
-
kW-mo/yr
|
- | $9,746 | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,308 | $550 |
$1,356
24,630
kWh
|
- | - | $(-48.0) | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,686 | - |
$3,686
64,658
kWh
|
- | - | - | - | |
06 | 2.2511: Insulate bare equipment | $1,281 | $971 | - | - |
$1,281
-
MMBtu
|
- | - | |
07 | 3.1291: Eliminate practice of mixing waste streams | $38,880 | $75,000 | - | - | - | - | $38,880 | |
08 | 4.448: Install automatic part storage / retreval system | $80,640 | $337,400 | - | - | - | $80,640 | - | |
09 | 4.441: Install automatic packing equipment | $30,576 | $66,500 | - | - | - | $30,576 | - | |
TOTAL RECOMMENDED | $178,116 | $497,083 |
$11,841
267,844
kWh
|
$5,200
-
kW-mo/yr
|
$1,281
-
MMBtu
|
$120,914 | $38,880 | ||
TOTAL IMPLEMENTED | $88,011 | $151,163 |
$5,113
128,965
kWh
|
$3,696
-
kW-mo/yr
|
- | $40,322 | $38,880 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Wood Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs