Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,374

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AS0103 #03 Y:1993 Install / repair insulation on steam lines $13,102 $3,208
AS0103 #02 Y:1993 Install / repair insulation on condensate lines $6,174 $1,463
AS0103 #01 Y:1993 Analyze flue gas for proper air/fuel ratio $13,038 $13,000
AS0102 #10 Y:1993 Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust $52,907 $200,000
AS0102 #09 Y:1993 Insulate bare equipment $4,056 $2,513
AS0102 #08 Y:1993 Insulate bare equipment $8,447 $1,104
AS0102 #07 Y:1993 Insulate bare equipment $4,374 $4,199
AS0102 #06 Y:1993 Use synthetic lubricant $1,145 $300
AS0102 #05 Y:1993 Eliminate leaks in inert gas and compressed air lines/ valves $1,606 -
AS0102 #04 Y:1993 Utilize energy-efficient belts and other improved mechanisms $2,536 $3,544
AS0102 #03 Y:1993 Use most efficient type of electric motors $1,297 $2,030
AS0102 #02 Y:1993 Utilize higher efficiency lamps and/or ballasts $45 $215
AS0102 #01 Y:1993 Utilize higher efficiency lamps and/or ballasts $341 -
AS0101 #10 Y:1993 Install set-back timers $1,019 $1,005
AS0101 #09 Y:1993 Install occupancy sensors $195 $236
AS0101 #08 Y:1993 Utilize higher efficiency lamps and/or ballasts $138 $272
AS0101 #07 Y:1993 Utilize higher efficiency lamps and/or ballasts $196 -
AS0101 #06 Y:1993 Install / repair insulation on steam lines $964 $463
AS0101 #05 Y:1993 Analyze flue gas for proper air/fuel ratio $201 $500
AS0101 #04 Y:1993 Use adjustable frequency drive or multiple speed motors on existing system $720 $1,584