ITAC Assessment: AS0102
ITAC logo
ITAC Assessment: AS0102
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product READY MIX CEMENT
NAICS
n/a
SIC 3273: Ready-Mixed Concrete
Sales Range $10
M
to 50
M
# of Employees 25
Plant Area
n/a
Annual Production 2,500,000
ton
Production Hrs. Annual 3,120
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $494,622 4,595,252
kWh
Natural Gas $239,301 55,854
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $76,754 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,154

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $341 - $366
3,517
kWh
- $(-25.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $45 $215 $45
293
kWh
- -
03 2.4133: Use most efficient type of electric motors $1,297 $2,030 $1,297
12,016
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,536 $3,544 $2,536
23,447
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,606 - $1,606
14,947
kWh
- -
06 2.4314: Use synthetic lubricant $1,145 $300 $1,145
10,551
kWh
- -
07 2.2511: Insulate bare equipment $4,374 $4,199 $1,275
11,723
kWh
- $3,099
08 2.2511: Insulate bare equipment $8,447 $1,104 $8,447
78,253
kWh
- -
09 2.2511: Insulate bare equipment $4,056 $2,513 - $4,056
-
MMBtu
-
10 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust $52,907 $200,000 $59,407
410,023
kWh
$(-12,350.0)
-
MMBtu
$5,850
TOTAL RECOMMENDED $76,754 $213,905 $76,124
564,770
kWh
$(-8,294.0)
-
MMBtu
$8,924
TOTAL IMPLEMENTED $10,154 $9,773 $7,080
65,650
kWh
- $3,074
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs