Assessment Year | 1993 |
---|---|
Principal Product | READY MIX CEMENT |
NAICS |
n/a
|
SIC | 3273: Ready-Mixed Concrete |
Sales Range | $10 M to 50M |
# of Employees | 25 |
Plant Area |
n/a
|
Annual Production | 2,500,000
ton
|
Production Hrs. Annual | 3,120
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $494,622 | 4,595,252 |
kWh
|
$0.11 |
Natural Gas | $239,301 | 55,854 |
MMBtu
|
$4.28 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $76,754 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,154 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $341 | - |
$366
3,517
kWh
|
- | $(-25.0) | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $45 | $215 |
$45
293
kWh
|
- | - | |
03 | 2.4133: Use most efficient type of electric motors | $1,297 | $2,030 |
$1,297
12,016
kWh
|
- | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,536 | $3,544 |
$2,536
23,447
kWh
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,606 | - |
$1,606
14,947
kWh
|
- | - | |
06 | 2.4314: Use synthetic lubricant | $1,145 | $300 |
$1,145
10,551
kWh
|
- | - | |
07 | 2.2511: Insulate bare equipment | $4,374 | $4,199 |
$1,275
11,723
kWh
|
- | $3,099 | |
08 | 2.2511: Insulate bare equipment | $8,447 | $1,104 |
$8,447
78,253
kWh
|
- | - | |
09 | 2.2511: Insulate bare equipment | $4,056 | $2,513 | - |
$4,056
-
MMBtu
|
- | |
10 | 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust | $52,907 | $200,000 |
$59,407
410,023
kWh
|
$(-12,350.0)
-
MMBtu
|
$5,850 | |
TOTAL RECOMMENDED | $76,754 | $213,905 |
$76,124
564,770
kWh
|
$(-8,294.0)
-
MMBtu
|
$8,924 | ||
TOTAL IMPLEMENTED | $10,154 | $9,773 |
$7,080
65,650
kWh
|
- | $3,074 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs