| Assessment Year | 1993 |
|---|---|
| Principal Product | READY MIX CEMENT |
| NAICS |
n/a
|
| SIC | 3273: Ready-Mixed Concrete |
| Sales Range | $10 M to 50M |
| # of Employees | 25 |
| Plant Area |
n/a
|
| Annual Production | 2,500,000
ton
|
| Production Hrs. Annual | 3,120
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $494,622 | 4,595,252 |
kWh
|
$0.11 |
| Natural Gas | $239,301 | 55,854 |
MMBtu
|
$4.28 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $76,754 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $10,154 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $341 | - |
$366
3,517
kWh
|
- | $(-25.0) | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $45 | $215 |
$45
293
kWh
|
- | - | |
| 03 | 2.4133: Use most efficient type of electric motors | $1,297 | $2,030 |
$1,297
12,016
kWh
|
- | - | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,536 | $3,544 |
$2,536
23,447
kWh
|
- | - | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,606 | - |
$1,606
14,947
kWh
|
- | - | |
| 06 | 2.4314: Use synthetic lubricant | $1,145 | $300 |
$1,145
10,551
kWh
|
- | - | |
| 07 | 2.2511: Insulate bare equipment | $4,374 | $4,199 |
$1,275
11,723
kWh
|
- | $3,099 | |
| 08 | 2.2511: Insulate bare equipment | $8,447 | $1,104 |
$8,447
78,253
kWh
|
- | - | |
| 09 | 2.2511: Insulate bare equipment | $4,056 | $2,513 | - |
$4,056
-
MMBtu
|
- | |
| 10 | 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust | $52,907 | $200,000 |
$59,407
410,023
kWh
|
$(-12,350.0)
-
MMBtu
|
$5,850 | |
| TOTAL RECOMMENDED | $76,754 | $213,905 |
$76,124
564,770
kWh
|
$(-8,294.0)
-
MMBtu
|
$8,924 | ||
| TOTAL IMPLEMENTED | $10,154 | $9,773 |
$7,080
65,650
kWh
|
- | $3,074 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs