Assessment Year | 1993 |
---|---|
Principal Product | SANITARY PAPER PRODUCTS |
NAICS |
n/a
|
SIC | 2621: Paper Mills |
Sales Range | $10 M to 50M |
# of Employees | 74 |
Plant Area |
n/a
|
Annual Production | 31,000
ton
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,878,760 | 30,515,827 |
kWh
|
$0.062 |
Natural Gas | $936,139 | 287,804 |
MMBtu
|
$3.25 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $71,232 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $47,854 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $13,038 | $13,000 | - |
$13,038
-
MMBtu
|
- | |
02 | 2.2122: Install / repair insulation on condensate lines | $6,174 | $1,463 | - |
$6,174
-
MMBtu
|
- | |
03 | 2.2136: Install / repair insulation on steam lines | $13,102 | $3,208 | - |
$13,102
-
MMBtu
|
- | |
04 | 2.4133: Use most efficient type of electric motors | $6,632 | $5,588 |
$6,632
107,855
kWh
|
- | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $14,958 | - |
$14,958
242,966
kWh
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,245 | - |
$4,443
72,098
kWh
|
- | $(-198.0) | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $124 | $678 |
$124
2,052
kWh
|
- | - | |
08 | 2.7135: Install occupancy sensors | $4,164 | $7,175 |
$4,164
67,702
kWh
|
- | - | |
09 | 2.6232: Install set-back timers | $8,795 | $2,025 |
$8,795
143,025
kWh
|
- | - | |
TOTAL RECOMMENDED | $71,232 | $33,137 |
$39,116
635,698
kWh
|
$32,314
-
MMBtu
|
$(-198.0) | ||
TOTAL IMPLEMENTED | $47,854 | $22,474 |
$21,714
352,873
kWh
|
$26,140
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs