ITAC Assessment: SF0380
ITAC logo
ITAC Assessment: SF0380
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Aspen Evaporative Cooler Pads
NAICS 321999: All Other Miscellaneous Wood Product Manufacturing
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 100,000
ft2
Annual Production 4,000,000
pieces
Production Hrs. Annual 5,360
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $75,143 660,000
kWh
Electricity Demand $16,484 2,220
kW-mo/yr
Electricity Fees $4,377 -
LPG $9,438 524
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,155 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,155

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,300 $360 $2,300
18,950
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,794 $1,762 $2,599
21,409
kWh
$195
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,815 $3,010 $1,352
11,138
kWh
$463
-
kW-mo/yr
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $156 $272 $112
921
kWh
$44
-
kW-mo/yr
05 2.7134: Use photocell controls $2,873 $7,164 $2,498
20,581
kWh
$375
-
kW-mo/yr
06 2.7135: Install occupancy sensors $217 $631 $168
1,381
kWh
$49
-
kW-mo/yr
TOTAL RECOMMENDED $10,155 $13,199 $9,029
74,380
kWh
$1,126
-
kW-mo/yr
TOTAL IMPLEMENTED $10,155 $13,199 $9,029
74,380
kWh
$1,126
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs