| Assessment Year | 2016 |
|---|---|
| Principal Product | Books printing |
| NAICS | 323117: Books Printing |
| SIC | 2732: Book Printing |
| Sales Range | $100 M to 500M |
| # of Employees | 584 |
| Plant Area |
407,806
ft2
|
| Annual Production | 115,000,000
pieces
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Virginia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,565,064 | 28,468,007 |
kWh
|
$0.055 |
| Electricity Demand | $870,251 | 51,814 |
kW-mo/yr
|
$16.80 |
| Natural Gas | $394,796 | 65,591 |
MMBtu
|
$6.02 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $361,928 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $311,968 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.2414: Use waste heat from hot flue gases to preheat | $161,462 | $330,000 | - | - |
$161,462
-
MMBtu
|
- | |
| 02 | 2.4224: Upgrade controls on compressors | $49,713 | $8,500 |
$35,047
637,210
kWh
|
$14,666
-
kW-mo/yr
|
- | - | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $45,853 | $50,000 |
$32,329
587,796
kWh
|
$13,524
-
kW-mo/yr
|
- | - | |
| 04 | 2.4157: Establish a predictive maintenance program | $45,119 | $1,000 |
$33,058
601,049
kWh
|
$13,826
-
kW-mo/yr
|
- | $(-1,765.0) | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $32,274 | $33,606 |
$22,748
413,601
kWh
|
$9,526
-
kW-mo/yr
|
- | - | |
| 06 | 2.4151: Develop a repair/replace policy | $9,710 | $691 |
$6,973
126,784
kWh
|
$2,923
-
kW-mo/yr
|
- | $(-186.0) | |
| 07 | 2.4239: Eliminate or reduce compressed air usage | $5,404 | $4,258 |
$3,808
69,232
kWh
|
$1,596
-
kW-mo/yr
|
- | - | |
| 08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,974 | $333 |
$3,512
63,847
kWh
|
$1,462
-
kW-mo/yr
|
- | - | |
| 09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,944 | $155 |
$2,785
50,636
kWh
|
$1,159
-
kW-mo/yr
|
- | - | |
| 10 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,228 | - |
$2,270
41,277
kWh
|
$958
-
kW-mo/yr
|
- | - | |
| 11 | 2.2511: Insulate bare equipment | $247 | $439 | - | - |
$247
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $361,928 | $428,982 |
$142,530
2,591,432
kWh
|
$59,640
-
kW-mo/yr
|
$161,709
-
MMBtu
|
$(-1,951.0) | ||
| TOTAL IMPLEMENTED | $311,968 | $420,043 |
$107,483
1,954,222
kWh
|
$44,974
-
kW-mo/yr
|
$161,462
-
MMBtu
|
$(-1,951.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs