ITAC Assessment: WI0169
ITAC logo
ITAC Assessment: WI0169
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Food Products (salads etc.)
NAICS
n/a
SIC 2092: Prepared Fresh or Frozen Fish and Seafoods
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 42,000
ft2
Annual Production 3,250,000
lb
Production Hrs. Annual 4,125
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,763 971,864
kWh
Natural Gas $21,139 9,675
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,292 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,059

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $34,181 $70,000 $31,099
-
kWh
$3,082
-
MMBtu
02 2.7447: Install vinyl strip / high speed / air curtain doors $2,593 $2,100 - $2,593
-
MMBtu
03 2.1233: Analyze flue gas for proper air/fuel ratio $1,001 $500 - $1,001
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $896 $1,454 $896
12,603
kWh
-
05 2.7135: Install occupancy sensors $570 $1,600 $570
7,913
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $51 - $51
586
kWh
-
TOTAL RECOMMENDED $39,292 $75,654 $32,616
21,102
kWh
$6,676
-
MMBtu
TOTAL IMPLEMENTED $4,059 $5,154 $1,466
20,516
kWh
$2,593
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs